Natural Gas Filter Element For Essential Separation And Purification Equipment
Product Description
The Gas Filter Element Is An Essential Separation And Purification Equipment Component
Natural Gas Filter Element For Essential Separation And Purification Equipment
Gas filter element is suitable for gas-liquid and liquid-solid separation of natural gas, artificial gas and other non-corrosive gases, such as nitrogen, carbon dioxide, propane, butane, etc. It is a gas gathering station and compressor station on natural gas gathering pipelines and gas pipelines , Distributing station, pigging station, terminal station and necessary separation and purification equipment components in various application fields.
Features:
Packaging | cowhide box + five-layer board box | Marketing Type: | Hot Products 2020 |
price | Negotiable | Warranty of core components: | 1 year |
After Warranty Service: | Video technical support | Customizable | YES |
Local Service Location: | Hebei | Brand Name: | filter |
Video outgoing-inspection: | provide | Warranty: | 6-8 months |
Machinery Test Report: | provide | After-sales Service Provided: | Online support |
Pic Show
FAQ:
Q. Do you provide customized filters or OEM?
Answer: Yes, just provide the specifications and drawings you need.
Q. Can it be produced based on samples?
Answer: Yes, we can produce according to your samples or technical drawings. We can build new molds, but we have to charge a new mold opening fee. When you order in bulk, the mold fee can be refunded.
Q. What are your packing conditions?
Answer: Usually, we pack the goods in neutral boxes, except for brown cartons. If you have a legally registered patent, we will pack the goods in your branded box after receiving your authorization letter.
Q. What are the payment terms?
Answer: T/T is 30% of the deposit and 70% before delivery. Before you pay the balance, we will show you the photos of the product and packaging.
Q. What are your delivery terms?
Answer: (1) FOB (2) CFR (3) CIF.
Q. What is your delivery time?
Answer: Usually, for MOQ, it will take 5-7 working days after receiving the advance payment. The specific delivery time depends on the model and the quantity of your order.