Advantage over the regular led high bay light:
1. To use fin sheet heat sink, 10 times heat dissipation effect compare with regular led light heat sink
2. Small size, light weight with E27 E26 E39 or E40 socket
3. Can be use with or without reflector
4. Milky cover is available
Features:
1, high-power & high efficiency LED as the light source, low power consumption, good color, power factor> 0.95, dramatically reducing the cost.
2, 6063 aluminum shell lamps, lamp surface for oxidation treatment; heat dissipation area, reduce the lamp failure rate and prolong lamp life.
3, each of the joint fixtures are made of high temperature resistant, anti-aging silicone for sealing process.
4, Aluminum or Acrylic Reflector 45° 60° 90° 120° are optional.
Specification:
Product Name: E40 Base 200W led high bay light | |
Item No. | BG-0317-200W |
Powder Consumption | 200W |
Replace HID Lamp | 600W-800W |
Dimension/Heat sink | 298*187mm |
Lumous flux | 120lm/W |
Power Factor | ≥0.95 |
LED Power Supply | MOSO driver or High quality driver |
Input Voltage | AC100-305V/50-60Hz |
LED Light Source | CREE XTE3535 |
Color Temperature | 2700~6500K |
Beam Angle | 60° / 90° / 120° available |
Color Rendering Index | ≥Ra80 |
Working Life | ≥50000Hrs |
Working Temperature | -20℃~60℃ |
Housing | Aluminum |
Warranty | 3 Year |
OEM | accept |
Application:
1, replace the incandescent lamp, energy saving lamps, lamp, mercury lamps, sodium lamps without changing the original holder.
2, warehouse lighting, corporate plant lighting, high-speed toll station lighting, gas stations, supermarkets, exhibition halls, stadiums
1, when used, has some light surface temperature is a normal phenomenon, light surface temperature is higher, not touch. When you install or use, the lamps do not close to combustible material.
2, in the installation, you must disconnect the power supply when maintenance of lamps.
3, lamps keep the surface clean, help heat lamps can reduce lighting failure and prolong life
Trade Terms:
1). Payment: T/T, 30% deposit in advance, 70% balance payment before delivery
2). Production lead time for bulk order: 20days
3). Shipping: Sample order by International Express; Mass order by air or ship
Contact Info:
Cherry Chan /Sales Manager/BARRGOO Email : cherry.c@barrgoo.com Skype:cherrychan8866 TEL/ Whatsapp:8615972190016 CONTACT US! WE WIll NEVER LET YOU DOWN! WeChat: cherry719267 Phone:86 027 87671265 Fax:86 027 87671264 |