1U Rack 24 Port gigabit L2 Managed POE Switch
12 RJ45 +12 SFP Mounted for outdoor use
Key Features of L2 managed switch
Specification of 24 ports POE Ethernet Switch
Model No. | IM-FP121212GW |
Standard | IEEE 802.3, IEEE802.3U, IEEE802.3ab, IEEE802.3z, IEEE802.1d STP, IEEE802.1w RSTP, IEEE802.1s MSTP, ITU-T G.8023 EPR/Y.1344, IEEE802.1Q, IEEE802.1X, IEEE802.3ad, IEEE802.3x, IEEE802.3af, IEEE802.3at, IEEE802.1ad, IEEE802.1p, IEEE802.1ab, IEEE802.3az |
VLAND ID | 4096 |
Jumbo Frame | 9.6KB |
MAC Address Table Size | 8K |
Poe Standard | IEEE802.3af, total MAX power is 340W |
Switching features | Transmission mode:storage and forward System bandwidth:58Gbps (non-traffic jam) DRAM size: 128M Flash size: 16M Packet buffer size: 4Mb |
Network media | 10BASE-T: CAT3, CAT4, CAT5 un-shielded twisted pair(≤100m) 100/1000BASE-TX: CAT5 or above shielded twisted pair(≤100m) SFP port,transmission distance: 20Km,40Km,60Km,80Km,100Km |
LEDs | Power, network, fiber |
Power supply | Input voltage:DC48V Non-polar power input :support |
Environment | Working temperature:-40°~ 75°C Working humidity:5%~95%,non-condensing |
Industry Standards | EMI:FCC Part 15 Subpart B Class A,EN 55022 Class A, EN61000-6-4- Emission for industrial environment EMS:EN61000-6-2-Immunity for industrial environment, EN 61000-4-2 (ESD) Level 3,EN 61000-4-3 (RS) Level 3, EN 61000-4-4 (EFT) Level 3,EN 61000-4-5 (Surge) Level 3, EN 61000-4-6 (CS) Level 3,EN 61000-4-8 Traffic Control:NEMA-TS2, Vibration:IEC 60068-2-6 Freefall:IEC 60068-2-32, Shock:IEC 60068-2-27 Rail Traffic:EN 50121-4 |
Mechanical information | Safety class:IP30 Dimension:483x 275 x 44.5mm |
Warranty | 3 years |
FAQ:
1. Are you a manufacturer?
Yes, we have our production line and R&D team.
Please visit us via below VR link to see our office and production area.
https://www.ecer.com/corp/uuu5b8d-industrialnetworkswitch/vr.html
2. What is the leadtime if I order?
After receiving the payment, we start production.
If you are ordering some popular models, we usually got stock. After some testings, we will ship the materials.
If we do not have stock, production time is usually 3~5 working days for less than 50pcs/pairs.
3. How will you ship my order?
We will send the goods by air(DHL, UPS or FEDEX) or by sea(for bulk order)
It is fine to ship purchased items via customer’s shipping account or forwarder.
It takes 3~5 calendar days to arrive at local customs for clearance.
4. What is MoQ?
1 Pc/Pair.
For many models, we have stock, it is easy to send samples for your testing.
5. Can I have a discount?
Yes and it is usually based on quantity and after sample testing.