60 kg/h hydralic oil processing equipment cold oil expeller price
Instruction of hydraulic oil press machine:
Oil Pressers Theory:
The working principle is that the when the oil material is put into the assembly of the press boring, then it being driven up by the oil cylinder piston, oil will be outflow from the gap of press boring,and then pass the oil drip pan to the drum for oil storage.
Product Model and Parameters :
1. You can choose the model according to your needs.
2. We reserve the right to update the technology, please contact us for the latest information.
3. Accept customization.
Model | 6YY-185 | 6YY-230A | 6YY-270 | 6YY-300 | 6YY-335 |
Weight | 550kg | 924kg | 1230kg | 1600kg | 1750kg |
vacuum Power | 1.1kw | 1.1kw | 2.2kw | 2.2kw | 2.2kw |
3phase | 2.2kw | 2.2kw | 4.0kw | 4.0kw | 4.8kw |
Working pressure | 60MPa | 60MPa | 60MPa | 60MPa | 60MPa |
Capacity | 4kg/batch | 8.5kg/batch | 13.5kg/batch | 16kg/batch | 20kg/batch |
Dimension(mm) | 600*880*1150 | 670*950*1460 | 750*1010*1640 | 1000*1100*1660 | 1100*1240*1730 |
1. High oil output rate: the oil output line is smooth and there is no residue. The high-pressure machine can squeeze the raw materials clean.
2. Low wear: The machine is made of alloy steel, which is more wear-resistant and has a long service life.
3. Durable: The main parts of our machine are produced by ourselves to ensure the oil rate and quality of the machine.
4. Time-saving and labor-saving: This machine includes automatic control system, temperature control system and hydraulic control system to realize automatic unit, reduce labor and improve work efficiency. The operation is simple and can be operated by one person.
5. Safety guarantee: Our products have four protections: phase change valve, high pressure oil pump, low pressure oil pump and pressure relief valve.
Seeds application of hydraulic oil making machine
If you want to process other special raw material, please cantact us to ensure.
Simple operation
Our service
Provide quality service
1.Professional engineer
Our professional engineer will test the machine in each step.
2.Specialist manufacture
Every machine carefully adjusted before shipment.
3.After-service
The equipment guarantee period is one year, During guarantee period, the seller will provide maintenance free service.(Except the breakdown and destroy caused by person and force majeure)
Packing and shipping
We have in enough stock and can arrange shipping for you as soon as possible.