Specifications
Place of Origin :
Shaanxi, China
Brand Name :
AE
Price :
Negotiation
Certification :
CE;ISO9001;ISO14001;OHSAS 18001
MOQ :
1
Delivery Time :
30-90work days
Key Selling Points :
Long Service Life
Applicable Industries :
Manufacturing Plant
Showroom Location :
Indonesia, Mexico, Russia, South Africa
Description

AOD (argon oxygen decarburization) Furnace

AOD (argon oxygen decarburization) Furnace 3T-120T Argon Oxygen Decarburization Furnace and Ladle Refining Furnace with 8000 KG Weight

AOD argon oxygen decarburization furnace is a kind of Ladle Refining Furnace, which is characterized by side-blowing oxygen through the bottom tuyere with an immersion way. When the tuyere center is blown in with oxygen, argon and mixed gas of nitrogen, the proportion of argen and oxygen should be adjusted, then, it can achieve the purpose of decarburizing and retaining of chrome. Argon and nitrogen are used as cooling gas for tuyere ring to extend the life of tuyere. It can get the best operation by controlling the flow of the tuyere ring. And the flow of the tuyere center and tuyere ring can be controlled in master-control room.

The burning loss of tuyere, refractories and chrome is influenced greatly by the temperature of molten steel. So we can offer a special online temperature measuring system to buyers.

We adopt secondary combustion of top lance technology. It can increase the volume of cold material put into the VOD and shorten the duration of smelting, and guarantee the continuous casting for multiple furnaces at last.

We also use the charging system with a weigh on its multiple bunkers, which can be directly connected with control system of computer. Then the smelting cycle will be shortened and labor intensity will be reduced.

This equipment has a control system of intellectualized smelting process, which can decrease the consumption of all kinds of raw materials and gas during the smelting, and guarantee a stable quality of products.

New security design for smelting

It is aiming at the plugging of lance and the back-flow of molten steel which caused by electricity interruption during smelting process.

AOD series Ladle Refining Furnaces have a function to keep pressure of tuyere and contain uninterruptable power output to stop the above accidents, consequently improve the safety of smelting process.

After sales:
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.

Send your message to this supplier
Send Now

3 Ton - 120 Ton AOD Furnace Argon Oxygen Decarburization Furnace

Ask Latest Price
Place of Origin :
Shaanxi, China
Brand Name :
AE
Price :
Negotiation
Certification :
CE;ISO9001;ISO14001;OHSAS 18001
MOQ :
1
Delivery Time :
30-90work days
Contact Supplier
3 Ton - 120 Ton AOD Furnace Argon Oxygen Decarburization Furnace
3 Ton - 120 Ton AOD Furnace Argon Oxygen Decarburization Furnace

Xi'an Abundance Metallurgical Equipment Co., Ltd.

Verified Supplier
1 Years
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement