Heavy Duty Adjustable Ce Approved Storage Pallet Rack for Warehouse
Warehouse Heavy Duty Selective Pallet Racking and Shelving System
Surface treatment: Electrostatic spraying has a fully automatic production line, use Aksu powder, concrete technology and quality are:
1)black billet → chemical rust remover to remove surface dirt spray → phosphate → finished leveling curing;
2) the shelf surface with epoxy powder spraying process, coating thickness of 60 to 80 microns;
3)electrostatic powder coating adhesion to GB92865-88 standard, level 0 requirements;
4)hardness, wear resistance is 100 times more than ordinary nitro, to GB6739-86 standard in 2H requirements;
5)corrosion resistance (hydrochloric acid experiment) GB1771-91 is greater than 500 hours.
Model | Industrial Warehouse pallet rack | ||||||
Pallet Size | A) W1200*D1000mm | B)W1200*D1200mm | C) W1200*D1100mm | D) W1200*D800mm | |||
Materials Optional | A) Quality Steel Q235A used for normal temperature storage situation | ||||||
B) Quality Steel Q235B used for cold storage room | |||||||
C) Environmental protection powder for surface treatment--powder coating | |||||||
Craft-work | A) hole-punching | B) cold rolling | C) welding | D) powder coating | |||
Structure | A) bolted structure | B) welded structure | |||||
Color | A) as to our standard model | B) according to customer's requests | |||||
Pack model | A) standard export packing | B) according to customer's requests | |||||
Package material | A) transparent and dust-proof poly-sheet | ||||||
B) hard carton paper | |||||||
C) long and thin plywood bar | |||||||
D) plywood pallet; steel and plastic straps | |||||||
E) air bag used when loading container | |||||||
MOQ | 5-10 sets; the model is subject to your requirements | ||||||
Payment | A) T/T | B) LC | C) Paypal or Western Union | ||||
Warranty | A) one year against manufacturing defect | ||||||
B) 8-10 years of life time, offer lifetime consultation on problems occurred | |||||||
Quantity | A) 20' container | B) 40' container | C) a sample order | ||||
17500kgs | 26000kgs | 1 set | |||||
Delivery time | In 15 days | In 20 days | In 7 days | ||||
Note | All racks can be customized |
FAQ
a: May I know the status of my order?
We will send you photos or video and help you to update.
b: Quick manufacturing time
For Normal orders, we will promise to produce within 15 workdays.
As a manufactory, we can essure the delivery time according to the formal contract.
c: What is delivery times?
Normally, delivery time is within 20 workdays.
d: What is the term of payment?
T/T: 30% deposit in advance after confirmed order,
70% balance payment before shipment
WESTERN UNION, PAYPAL