Mould Name | Concrete Mould Precision Injection Mould S136 Stainless and 718H Mould |
Mould Cavity | Design as the customer 's needs (single , multi ) |
Mould Steel Material | DIN 1.2316,1.2738,1.2344,718,P20,etc . |
Mould Base | LkM, hasco, Mis umi |
Mould Running | Fully automatic |
Mould Runner System | Hot runner /cold runner |
Mould Features | Excellent precision control for demension to tolerance . |
Hardness for core and sliders | Hrc42-48 |
Injection Cycle Time | 18-100seconds |
Mould Life | 500,000-1,000,000 shots |
Plastic Injection Mould making
1.Samples/Drawing &Requirement from you
2.Mould design:we will Communicate and Exchange the opinion with you after you place order.
3.Material Purchase:Steel cutting and Mould base tooling.
4.Assembling.
5.Inspection of mould : following and controlling the tooling processing.
6.Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you!
7.Your instruction &confirmation for shipment.
8.Ready made mould before packing.
9.We provide any differeny kinds of plastic injection mould, blow mould, silicone mould, die casting mould service.
Plastic molding Specification
1. Professional manufacturer,design,production injection mould and stamping mould quality control
2. rich export experience plastic injection mould and stamping mould
3. Reasonable price of design mould
4. Cavities: single or as per your requirements cavity
5. Treatment: S45C Pretreat>25Hrc,And Nitriding
6. Mould Steel: Cavity ,Core and slide: P20 ,2738,2136 available Moldbase :LKM available
7. Standard:DEM ,HUSKY,available
8. Hot runner: according to your demand
9. Life time: >300 Thousand Times
10. Package: Plywood case, anti-rust paint
RJC Industrial Co., Ltd was established in 2002,it has grown up to be one of the highly reputable supplier in terms of the service of mold manufacturing,injection molding , CNC machining ,CNC lathing and so on .
Up to now , RJC has dedicated team to support oversea business in terms of business development , engineering support and continuous improvement to guarantee better schedule and quality delivered .
1.How about your quality control?
We have professional team to control mold quality, since we realize that quality control is the first priority to run business.
2.What's your lead time?
For most mold, 45 to 60 working days (not including Chinese official holidays) after deposit received and mold drawings approved.
3.How to approval samples?
1) You can come to have the mold test directly.
2) We could send samples by DHL, TNT, FedEx, and we can send mold running video to you.
4.What about after service?
Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.