XC9572XL-10TQG100C
Products Description:
• 5 ns pin-to-pin logic delays • System frequency up to 178 MHz • 72 macrocells with 1,600 usable gates • Available in small footprint packages - 44-pin PLCC (34 user I/O pins) - 44-pin VQFP (34 user I/O pins) - 48-pin CSP (38 user I/O pins) - 64-pin VQFP (52 user I/O pins) - 100-pin TQFP (72 user I/O pins) - Pb-free available for all packages • Optimized for high-performance 3.3V systems - Low power operation - 5V tolerant I/O pins accept 5V, 3.3V, and 2.5V signals - 3.3V or 2.5V output capability - Advanced 0.35 micron feature size CMOS Fast FLASH™ technology • Advanced system features - In-system programmable - Superior pin-locking and routability with Fast CONNECT™ II switch matrix - Extra wide 54-input Function Blocks - Up to 90 product-terms per macrocell with individual product-term allocation - Local clock inversion with three global and one product-term clocks - Individual output enable per output pin - Input hysteresis on all user and boundary-scan pin inputs - Bus-hold circuitry on all user pin inputs - Full IEEE Standard 1149.1 boundary-scan (JTAG) • Fast concurrent programming • Slew rate control on individual outputs • Enhanced data security features • Excellent quality and reliability - Endurance exceeding 10,000 program/erase cycles - 20 year data retention - ESD protection exceeding 2,000V • Pin-compatible with 5V-core XC9572 device in the 44-pin PLCC package and the 100-pin TQFP package WARNING: Programming temperature range of TA = 0° C to +70° C
Technological Parameters:
category | Integrated Circuit (IC) |
manufacturer | AMD |
series | XC9500XL |
Programmable type | Programmable within the system (minimum 10000 programming/erase cycles) |
Delay time tpd (1) maximum value | 10 ns |
Supply voltage - internal | 3V ~ 3.6V |
Logical components/number of blocks | 4 |
Number of Macrocell array | 72 |
Number of gates | 1600 |
I/O count | 72 |
operation temperature | 0°C ~ 70°C(TA) |
Supplier Device Packaging | 100-TQFP(14x14) |
Customer Service:
1. Do you support BOM lists?
Of course, we have a professional team to provide BOM.
2. Shown below. Behind MOQ?
Our MOQ is flexible and can be provided according to your needs, with a minimum of 10 pieces.
3. What about lead time?
After receiving the deposit, we will arrange to pack the goods and contact logistics for delivery. The duration is 3-7 days.
4. Our advantage?
1. Stable and sufficient supply
2. Competitive pricing
3. Rich BOM experience
4. Perfect after-sales service
5. Professional test certificate
5. Our service?
Payment methods :T/T, L/C, D/P, D/A, MoneyGram, Credit Card, paypal, Western Union, Cash, Escrow, Alipay...
6. Transportation:
DHL, TNT, FedEx, EMS, DEPX, Air, Sea Shipping
Product Photos: