1. Introduction of Product
Large Diameter U-PVC Water Supply & Drainage Pipe Production Line
GF series plastic pipe extrusion line is mainly used in the area of agricultural water supply system, architectural water supply system, pavement of cables…etc. As well as PVC pipe material of all sorts of pipe caliber and wall thickness. This machine group consists mainly of twin conical (parallel) screw extruder, vacuum calibration tank, haul-off unit, cutting unit, tilter…etc. The screw extruder and haul-off unit have applied imported A/C inverter, both vacuum pump and driving motor have applied excellent products. The drawing machine includes two-claw type, three-claw type, four-claw type, six-claw type, eight-claw type…etc. Sawing cutting or plant cutting can be applied, it is additionally applied with length measuring meter and thickness increasing device, the property of machine group is reliable, the production efficiency is high. With special device, it can produce inner wall spiral pipe, inner wall hollow pipe, and core layer foam pipe…etc. It can also produce PP, PE, ABS, PP-R, PEX, silicon core pipe and pipe of other material. The planetary cutting machine is fully automatic computer digital control, it has such advantages of simple operation, reliable property, etc. It has reached world advanced level.
2. Quick Detail:
Applied for manufacture of larger caliber UPVC supply and drain pipes.
Raw material+additive→mixing→conveying feeding→force feeding→conical double screw extruder→extrusion mould→calibrator→spray vacuum calibration tank→dip-in water tank→ink printer→belt haul-off→cutter→pipe rack→finished product inspecting & packing
3. Description:
Model |
Pipe Diameter Range(mm) |
Extruder |
Max Capacity(Kg/h) |
Power(Kw) |
PVC Sewage Pipe |
||||
PVC110 |
50mm-110mm |
SJSZ55/110 |
180 |
93 |
PVC160 |
50mm-160mm |
SJSZ55/110 |
180 |
120 |
PVC200 |
75mm-200mm |
SJSZ65/132 |
250 |
127 |
PVC Supply Pipe |
||||
PVC110 |
20mm-110mm |
SJSZ65/132 |
250 |
100 |
PVC160 |
50mm-160mm |
SJSZ65/132 |
250 |
127 |
PVC200 |
50mm-200mm |
SJSZ80/156 |
380 |
145 |
PVC Sewage Pipe/PVC Supply Pipe |
||||
PVC315 |
110mm-315mm |
SJSZ80/156 |
320 |
170 |
PVC400 |
160mm-400mm |
SJSZ80/156 |
380 |
170 |
PVC630 |
450mm-630mm |
SJSZ92/188 |
800 |
230 |
4. Applications:
This production line mainly used to produce U-PVC ,C-PVC and big-caliber PVC pipes for water supply and drainage.
5. Specifications:
Specification |
GF63 |
GF110 |
GF160 |
GF250 |
GF400 |
GF630 |
GF800 |
Pipe Dia.(mm) |
Ø16- Ø63 |
50- Ø110 |
Ø75- Ø160 |
Ø110- Ø250 |
Ø160- Ø400 |
Ø315- Ø630 |
Ø450- Ø800 |
Claw number of drawing machine |
2 |
2 |
2 |
3 |
4 |
6 |
8 |
Pulling force(KN) |
6 |
8 |
11 |
20 |
30 |
40 |
50 |
Drawing speed(m/s) |
15 |
12 |
8 |
9 |
4 |
2 |
2 |
Total power of auxiliary machine(Kw) |
14 |
14 |
14 |
21.5 |
41 |
56 |
64 |
6. Competitive Advantage:
This line can solve the problems of high temperature melting, high viscosity, easy-decomposition. The special designed screw, gearbox, tooling, and HMI system make the line reliable and easy operation.
7.. Service:
1. Oversea installation guide.
2. Oversea test running
3. Ovsersea worker training
4. Technical support
5. Spare parts supply
6. Technical operation support
7. Formula and processing support
8. Option
The line is mainly for producing PVC-U pipes for wire and cable.
It can extrude two pipes at one time, which enhances production efficiency dramatically.
Each pipe is hauled off and cut individually, which effectively lowers unqualified ratio in pipe production.
9. Commercial Terms
1. Payment: 30% by T/T as advance payment, balance(70%) by T/T before shipment
2. Lead Time: 60 days after receiving the advance payment
3. Transportation: container, simple package ( PE film, salver)
4.Warranty period: From the day of the use of the machine in the buyer’s factory:
(1) The mechanical Parts: 12 months
(2) The electrical Parts: 6 months
5. Installations and Commissioning
(1) Up to date commissioning has been made before shipment
(2) Overseas Commissioning and charges
one or two technicians will be sent to the buyer to guide the installation and commissioning of the equipment if the customer requests.
Customers pay the charge of our technicians.
(1) Round-trip Airplane Ticket
(2) Charges of transportation, accommodation and communication
(3) The allowance for the technicians is USD 80 per day for one person.
(4) An interpreter is needed.
6. Spare parts:
Spare parts for one year are needed for the customers, and we suggest that customers should buy the spare parts. (Fittings list will be provided.)
7. English manual, Figuration drawing, and footing drawings are provided.