4331851 4663807 4663808 Hex Bolt Track Roller Bolt for ZX240-6 Excavator & Dozer Bolt and Nut JBXF
BRAND | CATALOGUE | ||||||||
BULLDOZER | D20 | D30 | D31 | D37 | D40 | D41 | D45 | D50 | D60 |
D65 | D68 | D75 | D80 | D85 | D150 | D155 | D275 | D355 | |
D3C | D3D | D4C | D4D | D4H | D5 | D6C | D6D | D6H | |
D7G | D8K | D8N | D9N | D10N | D11N | ||||
KOMATSU | PC30 | PC40 | PC45 | PC60 | PC75 | PC100 | PC120 | PC150 | PC200 |
PC220 | PC300 | PC350 | PC400 | ||||||
CATERPILLAR | E70B | E110 | E120B | E215 | E235 | E307 | E311 | E312 | E322 |
E180 | E240 | E200B | E320 | E300 | E300B | E330 | E325 | ||
HITACHI | EX30 | EX40 | EX60 | EX100 | EX120 | EX200 | EX220 | EX270 | EX300 |
EX400 | EX600 | UH043 | UH052 | UH53 | UH07 | UH081 | UH082 | UH083 | |
FIAT-HITACHI | FH120 | FH130 | FH150 | FH200 | FH220 | FH270 | FH300 | ||
VOLVO | EC55 | EC130 | EC150 | EC200 | EC210 | EC240 | EC290 | EC360 | |
DAEWOO | DH55 | DH130 | DH180 | DH200 | DH280 | DH300 | DH320 | ||
HYUNDAI | R60 | R130 | R200 | R210 | R220 | R290 | R320 | R914 | |
KATO | HD250 | HD400 | HD450 | HD700 | HD770 | HD820 | HD1250 | ||
KOBELCO | SK40 | SK60 | SK100 | SK120 | SK200 | SK220 | SK04-2 | SK07 | |
SK07N2 | SK09 | SK12 | SK14 | SK300 | SK310 | SK400 | |||
JCB | JS70 | JS75 | JS110 | JS130 | JS160 | JS180 | JS200 | JS220 | |
JS240 | JS260 | JS300 | JS330 | ||||||
SUMITOMO | SH70 | SH100 | SH120 | SH160 | SH200 | SH260 | SH265 | SH280 | SH300 |
SH340 | LS2650 | LS2800 | LS3400 | LS4300 | |||||
MX8 | SE200 | SE210 | SE280 | MX292 | SE350 | ||||
MITSUBISHI | MS110 | MS120 | MS140 | MS180 |
What is the brand name of the roller bolts?
JBXF
What is the model number for the roller bolts?
Bolts and nuts
Where is the roller bolt product made?
It is made in China.
What certifications does the roller bolt product have?
It has CE and ISO certifications.
What is the minimum order quantity for the roller bolts?
The minimum order quantity is between 5000-10000 pieces.
What is the price of the roller bolt?
The price is 0.5$ per piece.
What are the packaging details for the roller bolts?
The packaging details include 10000 pieces in a carton, bag, or pallet, and delivery within 1 day.
What is the delivery time for the roller bolts?
The delivery time is 7-15 working days.
What are the payment terms for the roller bolts?
The payment terms are TT (Telegraphic Transfer).
What is the supply ability for the roller bolts?
The supply ability includes carton, bag, or pallet.