Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System
Product profile
The material used to manufacture our ventilation pipe clamps with rubber is galvanized steel
DX 51 D+Z80, DX 51 D+Z275, with PVC rubber. It comes in sizes from 80mm to 1250mm. The
width is 20 mm for Dia 80 – 400 mm and 25 mm above Dia 400 mm and the thickness is 1.8 mm
under Dia 400 mm and 2.5mm above Dia 400 mm. Our ventilation pipe clamps with rubber also
have a quick locking system on one side from 80 to 400mm. The locking screw is M6x20mm from
80-400mm, and M10x25mm from 450-1250mm. Last but not least, the Hex nut is M8/M10 for
80-400mm, but also available for 450-1250mm upon request. The Maximum suspended weight
for 800kg is from 80 to 400mm, and for 1000kg from 450 to 1250mm (if there is a hex nut – upon
request).
Pipe clamps are two-piece circular pipe clamps fastened together with a pair of steel bolts.
They are used for suspending the spiral duct in the ventilation system.
Item code | D (mm) | Width x Thickness (mm) | Hex connection nut |
PCWR 080 | 80 | 20x1.8 | M8/M10 |
PCWR 090 | 90 | 20x1.8 | M8/M10 |
PCWR 100 | 100 | 20x1.8 | M8/M10 |
PCWR 110 | 110 | 20x1.8 | M8/M10 |
PCWR 125 | 112 | 20x1.8 | M8/M10 |
PCWR 140 | 140 | 20x1.8 | M8/M10 |
PCWR 150 | 50 | 20x1.8 | M8/M10 |
PCWR 160 | 160 | 20x1.8 | M8/M10 |
PCWR 180 | 180 | 20x1.8 | M8/M10 |
PCWR 200 | 200 | 20x1.8 | M8/M10 |
PCWR 225 | 225 | 20x1.8 | M8/M10 |
PCWR 250 | 250 | 20x1.8 | M8/M10 |
PCWR 280 | 280 | 20x1.8 | M8/M10 |
PCWR 300 | 300 | 20x1.8 | M8/M10 |
PCWR 315 | 315 | 20x1.8 | M8/M10 |
PCWR 355 | 355 | 20x1.8 | M8/M10 |
PCWR 400 | 400 | 20x1.8 | M8/M10 |
PCWR 450 | 450 | 25x2.5 | Optional |
PCWR 500 | 500 | 25x2.5 | Optional |
PCWR 560 | 560 | 25x2.5 | Optional |
PCWR 600 | 600 | 25x2.5 | Optional |
PCWR 630 | 630 | 25x2.5 | Optional |
PCWR 710 | 710 | 25x2.5 | Optional |
PCWR 800 | 800 | 25x2.5 | Optional |
PCWR 900 | 900 | 25x2.5 | Optional |
PCWR 1000 | 1000 | 25x2.5 | Optional |
PCWR 1120 | 1120 | 25x2.5 | Optional |
PCWR 1250 | 1250 | 25x2.5 | Optional |
Similar Items
Company information
We established in 1997, we are one of the largest manufacturers of metal stamping and plastic molding
injection parts in China, we are close to the ocean ports of Ningbo and Shanghai. JH's specialty is made
to order (MTO) parts based on customer drawings or samples, more than 95% of our products are
exported the whole Europe countries, we have in house tool making which allows us to offer low cost
and fast tooling. meanwhile, we could supply the second operation with our customers like riveting,
tapping, electrolating, welding, assembly, powder coating..., we have robtic welder, powder coating and
assembly line in house.
FAQ
Q: What is the payment method?
A: We accept TT (Bank Transfer), L/C.
1. For total amount under US$3000, 100% in advance.
2. For total amount above US$3000, 30% in advance, the rest against the copy document.
Q: What is your MOQ?
A: MOQ depends on our client's needs, besides,we welcome trial order before mass-production.
Q: What is the production cycle?
A: It varies a lot depending on product dimension,technical requirements and quantity. We always
try to meet customers' requirement by adjusting our workshop schedule. Usually our normal lead
time is 25-30 days for 1 full container; it is also up to the actual production situation and products
structure.
Q: If you make poor quality goods,will you refund our fund?
A: We make products according to drawings or samples strictly until them reach your 100%
satisfaction.And actually we won't take a chance to do poor quality products.We are proud of
keeping the spirit of good quality.
Q: Could you offer competitive tooling cost?
A: We have own mold work-shop in our factory, for competitive tooling cost and on-time
samples.