Specifications
Place of Origin :
China
Certification :
BV, SGS, ABS
MOQ :
1TONS
Price :
USD600-1500/TONS
Packaging Details :
Plastic plugs in both ends, Hexagonal bundles of max. 2,000kg with several steel strips, Two tags on each bundle, Wrapped in waterproof paper, PVC sleeve, and sackcloth with several steel strips, Plastic caps.
Delivery Time :
7-5 working days
Payment Terms :
T/T, L/C
Supply Ability :
10000tons/year
Name :
Galvanized Aluminum Pipe
Material :
Nickel Alloy Pipe, Inconel625, Alloy 625, Nickel 625, Chornin625
Size :
1/4" to 24" Outside Diameter 13.7 mm to 609.6 mm
Wall thickness :
SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS
Standard :
ASTM B165 , ASTM B163 , ASTM B829 , ASTM B775 ,ASTM B725 ,ASTM B730 , ASTM B751
Applications field :
Steam turbine
Description

Tube Alloy c276 B575 / B619 4 Inch Stainless Steel Copper Cuni Aluminum Galvanized Steel Pipe

Product Name
alloy steel pipe
Material
Nickel Alloy Pipe, Inconel625, Alloy 625, Nickel 625, Chornin625
Pipe Length
Single Random Length and double Random Length.
SRL:3M-5.8M DRL:10-11.8M or As clients requested length
Size
Size 1/4" to 24" Outside Diameter 13.7 mm to 609.6 mm
Wall thickness
SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS
Standard
ASTM B165 , ASTM B163 , ASTM B829 , ASTM B775 ,ASTM B725 ,ASTM B730 , ASTM B751
ASTM B 444, ASME SB444
Applications field
The elevated temperature strength, excellent corrosion resistance and work ability at 700℃ properties made it use in a wide range
of high requirement environments.
1. Steam turbine
2. Liquid-fuel rocket
3. Cryogenic engineering
4. Acid environment
5. Nuclear engineering
Chemical composition
Ni: 50~55% ; Cr:17~21% ; Fe: balance;Mo:2.8~3.3% ; Nb: 4.75~5.5% ; Co: ≤1.0% ; C≤0.08% ; Mn≤0.35% ; Si≤ 0.35% ; Cu≤0.3% ; Al:
0.2~0.8% ; Ti: 0.65~1.15% ; P≤0.015% ;
Certificate
ISO/PED/TUV/SGS/LR/BV
Send your message to this supplier
Send Now

Steam Turbine Alloy Steel Tube C276 B575 / B619 4 Inch Stainless Steel Pipe

Ask Latest Price
Place of Origin :
China
Certification :
BV, SGS, ABS
MOQ :
1TONS
Price :
USD600-1500/TONS
Packaging Details :
Plastic plugs in both ends, Hexagonal bundles of max. 2,000kg with several steel strips, Two tags on each bundle, Wrapped in waterproof paper, PVC sleeve, and sackcloth with several steel strips, Plastic caps.
Delivery Time :
7-5 working days
Contact Supplier
Steam Turbine Alloy Steel Tube C276 B575 / B619 4 Inch Stainless Steel Pipe
Steam Turbine Alloy Steel Tube C276 B575 / B619 4 Inch Stainless Steel Pipe

Joho Steel Co., Ltd

Verified Supplier
3 Years
changsha
Since 2020
Business Type :
Manufacturer, Exporter, Trading Company, Seller, Other
Total Annual :
5000000-20000000
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement