We will make the construction drawing after designing the effect drawing for the customers.
Enter the site, carry the site construction drawings, construction drawings of each area, and structure drawings, first lay the floor mat, and then build the steel pipe, bag pipe, pull the purse Seine, and do modeling. All screws, iron and sharp objects on site must not be exposed, and must be wrapped with a tube or plastic cap.