Specifications
Brand Name :
Kaineng
Model Number :
KNLW700KW
Certification :
ISO
Place of Origin :
China
MOQ :
1 Set
Price :
Negotiable
Payment Terms :
L/C, T/T, Western Union, MoneyGram
Supply Ability :
3000 sets per year
Delivery Time :
60 working days since order confirmed
Packaging Details :
Seaworthy standard packing
Product Name :
600-700kw threaded tube boiler, Exhaust Gas Hot Water Boiler
Type :
Horizontal
Application :
Fuel oil and gas
Working temperature (inlet / outlet) ℃ :
60/175.4℃
Working Pressure :
0.8MPa
Description

600-700kw threaded tube boiler, Exhaust Gas Hot Water Boiler

Description of Exhaust Gas Boiler:

KNLW exhaust boiler is the high efficient energy saving equipment specially designed for waste heat recovery of the oil gas generator sets. The boiler adopts screwed tube as heat transfer enhanced components, special processed with thread line in tube. The flue gas will rotate to strengthen the heat transfer when it through the tube, so that the boiler heating area can be reduced, the dimensions and weight can be decreased. The exhaust boiler is characterized by simple structure, high heat efficiency, long working life, safe and reliable, maintenance friendly.

Composition of Each exhaust gas boiler:

  1. Inlet smoke box,

  2. Outlet smoke box,

  3. Threaded pipes,

  4. Smoke returning chamber

  5. < >

    The threaded tube exhaust gas boiler is fully welded. The threaded tube is welded to the tube sheet, and the tube sheet is welded with the drum to form a closed space. The drum is equipped with many accessories necessary for the boiler. Since the flow of flue gas in the pipe is double pass, the inlet and outlet boxes are at the same end of the boiler, and the necessary man holes are equipped on the smoke box for inspection and water washing. Insulation material is additionally provided on the outside of the drum to reduce heat loss. The outside of the insulation material is galvanized steel plate to protect the insulation material from damage.

    Exhaust gas boiler (EGB) benefits :

    1. Highly reliable in operation and robust in construction.

    2. Quick Payback Returns are achieved.

    3. One time investment with lifetime returns.

    4. No combustion, No emission hence Eco-friendly.

    5. Energy being put to use, which was getting wasted anyway.

    Exhaust gas boiler capacity :

    Exhaust gas boiler (EGB) are offered in tailor-made capacities as per

    Kaineng Service:

    Pre-sale service:

    Kaineng helps customer to choose the proper waste heat boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.

    In-sale service:

    Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.

    After-sale service:

    1. provide full range of original quality spare parts.

    2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.

    3. Our engineers will held a training for boiler workers to ensure the safe operation.

    4. Free maintenance and repair for one year and lifelong service.

  6. 600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure

  7. 600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure

    600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure

    Detail map:

    600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure

  8. Kaineng Service:

    Pre-sale service:

    Kaineng helps customer to choose the proper waste heat boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.

    In-sale service:

    Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.

    After-sale service:

    1. provide full range of original quality spare parts.

    2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.

    3. Our engineers will held a training for boiler workers to ensure the safe operation.

    4. Free maintenance and repair for one year and lifelong service.

    600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure

Send your message to this supplier
Send Now

600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure

Ask Latest Price
Brand Name :
Kaineng
Model Number :
KNLW700KW
Certification :
ISO
Place of Origin :
China
MOQ :
1 Set
Price :
Negotiable
Contact Supplier
600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure
600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure
600 - 700kw Threaded Tube Waste Heat Recovery Boiler 0.8MPa Working Pressure

Qingdao Kaineng Environmental Protection Technology Co.,LTD

Active Member
6 Years
guizhou, qingdao
Since 1999
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter, Seller, Other
Total Annual :
15000000-25000000
Employee Number :
200~250
Certification Level :
Active Member
Contact Supplier
Submit Requirement