Manual Reset Ksd301 High Precision Thermal Switch 16A 250V Safety Protection Switch UL VDE CE CQC Certification
1. Company profile:
Light Country was founded in 1985 in Taiwan. We dedicate on bimetal thermal switch and rocker switch for 38 years.
We’re with integration of R&D, production, sales and post-sales as well, to provide fast respond service and best price.
We've got ISO9001, ISO14001, CQC, UL/CUL, VDE, TUV, SEMKO, NEMKO certificate, comply with ROHS/REACH regulations.
Our switches are widely used in household appliance, office equipment, beauty industry, medical devices, industial, and so on.
2. Advantages of our Bimetal Thermal Switch:
1) Easy mounting.
2) High precision, excellent temperature control.
3) Wide operating temperature range.
4) Flexible design, can be customized according to customer's requirements.
3. Parameters and specification:
Factory name | Light Country(Changshu)Co.,Ltd. |
Product | Bimetal thermostat |
Model | T24 |
Type | Manual Reset |
Electrical rating | 16A/250V, 15A/125V, 10A/250V |
Temperature range | 0℃~180℃ |
Differential | 8℃ or more, depend on customer's demand. |
Cap material | Stainless steel |
Terminal material | Brass with tin plated |
Terminal angle | 90℃ |
Case material | PPS |
Bracket type | Fixed type |
Circuit Resistance | ≤50mΩ |
Insulation Resistance | 100MΩ min. at DC 500V |
Dielectric Strength | AC 1450V/minute |
Operating Life | >100,000 cycles |
Product Certification | UL, CUL, CE, CQC, VDE |
Factory Certification | ISO9001, ISO14001, IATF16949 |
4. Applications of manual reset thermal switch:
Manual reset thermal switches are usually used in the case of safety protection that do not need frequently operation, for example,in the overheating protection in electrial motors, industrial equipments and so on. When the thermal switch cuts off, need manual intervention to check and reset.
5. Terms:
1) Payment:
Please arrange payment simultaneously after placing the order. We will arrange production once we receive the payment because most of our products are customized and can't be put into production in advance.
2) Lead time:
For small lot samples: 7 days
For large order: 10~20days with forecast
20~30 days without forecast.
We will try best to support to shorten the lead time if any urgent order.
3) Delivery term:
EXW is preferred, but we can also support FOB, CIF, DDP according to customer's request.