Factory Sell High Temperature Blast Drying Oven for Drying or Smelting
Product description
The parts used in the Blast Drying Oven are products that have been proved by the market for many years and have been generally recognized by the market. Most of them are imported products. We select thousands of parts to ensure the stability and aging resistance of the whole equipment in use Adopt advanced and mature technology and equipment to create products with extremely low failure rate, high stability and good cost performance. It is equipped with a variety of safety protection devices, including overtemperature protection, leakage protection, fan overload protection, overcurrent protection, phase sequence protection and other safety devices. In case of abnormal conditions during operation, it will automatically alarm. And it has the function of emergency shutdown in case of unstable input power supply. Fully protect the safety of the product itself and the surrounding environment, the overall design is reasonable, the details are handled properly, and the whole machine is beautiful and generous. In the design, the environmental protection and energy situation in the world are fully considered. In the selection of parts and materials and product design, try to be more energy-saving, more environmental friendly and more reasonable, and fully meet the requirements of modern enterprises for environmental protection and energy conservation. Select high-quality fan components and reasonable air duct circulation system. In the working state, the sound of the whole machine is also very low, giving the operator a better working environment and production environment. In terms of product architecture and design principles, all relevant standards in this field are fully considered, including ontology standards, electronic and electrical standards, etc.
1. Main technical parameters: | |
1 | Model: OW-881—TG |
Inner box size: 550 high x 550 wide x 450 deep | |
c | c Temperature resolution: 0.1° |
Temperature fluctuation: ±0.5° | |
Temperature uniformity: ±3° | |
2 | Temperature range: |
a | RT.+10℃~300℃ (the temperature range can be adjusted arbitrarily). |
3 | Heating and cooling rate: |
a | From room temperature to 200℃, about 20 minutes (display value). |
2. Structure and material: | |
1 | Inner box material: The inner material is SUS stainless steel 1.2mm |
2 | Outer box material: The outer material is high quality SPCC 201 1.2mm cold rolled sheet |
3 | Insulation layer: The insulation material is imported aluminum silicate fiber rock wool, which can avoid unnecessary energy loss. |
4 | Structural materials, made of national standard 8# channel steel and 10# channel steel, 10#H steel and 5# angle steel |
5 | Thickness of insulation layer: 100mm. |
8 | Control method: SSR thyristor dual display control, the whole process of blasting and heating is automatically completed |
9 | Temperature measuring body: K-type armored thermoelectric corner. |
10 | Special design, space saving and moderate operation height, easy maintenance. |
11 | Exhaust: 60mm diameter, 1 exhaust valve, the exhaust volume can be adjusted |
12 | Internal sealing of the box: all splicing gaps inside are fully welded by argon arc welding and coated with high temperature resistant glue |
3. Temperature control systems: | ||||
1 | Controller: high-precision dual display The controller can display the set temperature, measured temperature, heating working status, and has power-on self-checking and PID automatic computing capabilities. Zhejiang Chengneng | |||
2 | Temperature measurement: using K | |||
3 | Setting accuracy: 1℃. | |||
4 | Instrument setting range: temperature, 0℃~+300℃ | |||
5 | Emergency stop switch: An emergency stop switch is installed on the control cabinet for use in case of equipment accidents. | |||
6 | The temperature control element adopts SSR temperature control | |||
7 | The heating tube adopts high temperature resistant stainless steel heating tube | |||
8 | Heating power: 4.5KW (use 30% power after constant temperature) | |||
5. Blower system | ||||
1 | Air duct design: The equipment adopts 3 independent air duct design, the upper air duct is installed with blower motor, centrifugal fan blade, special type high pressure turbine toward the shell Install heating elements inside the air ducts on both sides External punching protects the deflector The hot air goes more accurately and the internal temperature is more uniform | |||
2 | Blower motor: YBX3 high-efficiency energy-saving embedded high-temperature-resistant special motor | |||
Electrical configuration and brand: contactor, continuous protection, overload protection, solid state relay, air circuit breaker, choose Schneider Himanton brand, good reliability | ||||
6. Safety protection device | ||||
1 | Over-temperature protection to prevent abnormal temperature rise and damage to materials, over-temperature cut off the heating and electricity and accompanied by sound and light alarm | |||
2 | sound and light alarm. | |||
3 | Total power phase sequence and phase loss protection | |||
4 | leakage protection. | |||
5 | Thermal overload The motor is overheated and damaged | |||
7. Power supply: 220V≤±10%, 50±0.5HZ, 2-phase 2-wire. Installation power 5KW. | ||||
8. Equipment use environment: | ||||
1) | Environmental conditions around the device: | |||
1 | Temperature: -30℃~70℃. | |||
2 | Relative humidity: ≤85%RH. | |||
3 | Atmospheric pressure: 86~106Kpa. | |||
4 | There is no strong vibration around. | |||
5 | No direct sunlight or direct radiation from other heat sources. | |||
6 | There is no strong airflow around. When the surrounding air needs to be forced to flow, the airflow should not be blown directly to the room. | |||
7 | There is no strong electromagnetic field around. | |||
8 | There is no high concentration of dust and corrosive substances around. | |||
9 | The site is well ventilated. | |||
10 | There should be at least one passing space around the equipment, namely: ≧600mm. | |||
11 | There should be a space where the box door can be opened and closed normally at the equipment unpacking door, and there should be no other objects directly in front of the equipment box door. | |||
9. Warranty period: The whole system warranty period of the machine is 1 year from the date of delivery. | ||||
10. Delivery time: 10 working days/set delivery after receiving your company's order and deposit. | ||||
11. Payment method: 30% in advance, 60% on delivery, and the balance should be paid within 6 months. | ||||
12. Random information: | ||||
1 | Operating Instructions. | |||
2 | Factory inspection certificate, after-sales guarantee | |||
13. Other | ||||
Optional configuration Temperature control table Touch LCD screen PLC programming Temperature module RS485 port MODBUS protocol programmed temperature curve graph Data saving and exporting | ||||
1 | This quotation is valid for two months from the quotation. | |||
2 | This quotation includes tax, including equipment fee, transportation and one-year after-sales service. |
Company profile
Y&X Beijing Technology Co., Ltd. was established in 2014 and is located in Beijing, the capital of China. Our company has become a professional enterprise integrating scientific research, design, new product development, production and manufacturing with strong technical force. As a family group, the mission from the beginning was to expand overseas markets and provide one-stop professional for overseas mining companies.
The company specializes in the research and supply of mineral processing reagents and equipments, including mineral processing equipment and laboratory mineral processing equipment; products are widely used in metallurgy, geology, petroleum, coal, chemicals, building materials, environmental protection, non-ferrous and non-metallic mines, Research departments in industries such as dressing plants, mineral processing laboratories in colleges and universities.
Laboratory equipment for mineral processing: mainly include crushing, grinding, screening, grading, magnetic separation, flotation, assay, sample preparation, leaching, analysis-electrolysis, shaking table, chute and other laboratory equipment and gravity separation equipment.
Our products sell well in Russia, Mongolia, Chile, Australia, Zimbabwe, Thailand, Laos, Indonesia,Tanzania, Nigeria and other countries and regions.
The enterprise has passed the IS09001 quality management system certification, and the product quality conforms to the relevant technical standards promulgated by the state and the enterprise.
FAQ to save your precious time!
Q1: What's the standard length of your profiles and tube?
A: The standard length of profiles and tube are 5800mm to suit for small container, and we also can cut to specific length, however a surcharge of machining and material scrap cost will be charged accordingly based on each individual invoice.
Q2: What's your MOQ?
A: we have no MOQ for our new customers, however a surcharge of USD80 will apply for all orders less that USD 1000 for custom handing cost purpose.
Q3: what is your payment terms?
A: The payment terms we accept is T/T or irrevocable L/C at sight, T/T preferred.
Q4: What's the lead time for small order and mass production?
A: 1-3 working days for small order, and 3-10 working days for mass production of material, and the final lead time will be subject to each individual invoice.
Q5: What certification do you have?
A: We have ISO 9001:2008 certificate.