Network scale: 600x346x32
Outlet diameter: 38.5mm
Mesh length: 600mm
Packing length: 77cm
Mesh width: 346mm
Package width: 42cm
Used for OE number: 17117600520
Mesh depth: 32mm
Packing height: 15cm
Weight: 3.4kg
Heat sink material: Aluminium
Cooler structure: Brazed cooling fins
Inlet diameter: 38.5mm
Water tank (radiator) material: Plastic
Car Model | Year | Engine | CC | KW | Type |
BMW 1 (F21) 125i | 2011-2019 | N20 B20 A | 1997 | 160 | Hatchback |
BMW 1 (F21)M135i | 2011- | N55 B30 A | 2979 | 235 | |
BMW 3 (F30, F80)316 d | 2012-2018 | B47 D20 A,N47 D20 C | 1995 | 85 | Saloon |
BMW 3 (F30, F80) 318 d | 2012-2015 | N47 D20 C | 105 | ||
BMW 3 (F30, F80)318 d | 2012-2018 | B47 D20 A,N47 D20 C | 100 | ||
BMW 3 (F30,F80)320i | 2012-2018 | N20 B20 A,N20 B20 B,N20 B20 D | 1997 | 135 | |
BMW 3 (F30,F80)320i | 2011-2018 | N20 B20 A,N20 B20 C, N26 B20 A | 180 | ||
BMW 3 (F30, F80)320ixDrive | 2012-2018 | N20 B20 A,N20 B20 B | 135 | ||
BMW 3 (F30, F80) 320i xDrive | 2012-2016 | N20 B20 A,N26 B20 A | 180 | ||
BMW 3 (F30, F80) 325 d | 2013-2016 | N47 D20 D | 1995 | 160 | |
BMW 3 (F30, F80)328 d | 2011-2016 | N47 D20 C | 135 | ||
BMW 3 (F30, F80)335 i | 2011-2015 | N55 B30 A | 2979 | 225 | |
BMW 3(F30, F80) 335 ixDrive | 2012-2015 | N55 B30 A | |||
BMW 3 Gran Turismo (F34) 318 d | 2013-2015 | N47 D20 C | 1995 | 105 | Hatchback |
BMW 3 Gran Turismo (F34) 320 d | 2013-2015 | N47 D20 C | 135 | ||
BMW 3 Gran Turismo (F34) 320iGT Sport | 2013-2016 | N20 B20 A,N20 B20 B | 1997 | ||
BMW 3 Gran Turismo (F34) 325 d | 2013-2016 | N47 D20 D | 1995 | 160 | |
BMW 3 Gran Turismo (F34)328i | 2013-2016 | N20 B20 A,N26 B20 A | 1997 | 180 | |
BMW 3 Gran Turismo (F34) 335 i | 2013-2016 | N55 B30 A | 2979 | 225 | |
BMW 3 Touring(F31)316 d | 2012-2019 | B47 D20 A,N47 D20 C | 1995 | 85 | Estate |
BMW 3 Touring(F31)318 d | 2012-2015 | N47 D20 C | 105 | ||
BMW 3 Touring(F31) 320 d | 2012-2019 | B47 D20 A,N47 D20 C | 120 |
FAQ:
Q1. What is your terms of packing?
Generally, we pack our goods in neutral white poly bags and kaqhi boxs. If you have special requirments for box ,the packges is negotiable.
Q2. What is the MOQ?
Q3. What is your terms of payment?
30% deposit before production ,70% of total amount should be paid before delivery.We'll show you the photos of the products and packages before you pay the balance.