Superb Craftsmanship And Excellent Quality
Focus on every detail and produce every hanger carefully
RFQ:
The production capacity :
-----------we have 16 sets hanger machine ,3 sets spraying booth and 2 oven . we could produce 360
boxes(500pcs/box) a day.
The delivery time:
-----------we have our production schedule, based on our production capacity , we could manufacture
2000 boxes in 7 days. Before we sign the contract, we will inform our customer our production schedule,
so we could confirm the delivery time.
The hanger quality:
----------- We have 4 skilled technicians responsible for the production of hangers. Thanks to our stable
hanger mechanical operation, our hangers are the same size and have sufficient support. Regarding
the surface treatment of hangers, during the spraying process, there is a proper spacing between the
hangers, so that our hangers rarely stick together or spray unevenly.