Specifications
Brand Name :
ASOE
Model Number :
Pipe-in Liner G Series
Certification :
ISO
Place of Origin :
China
MOQ :
10cm
Price :
Negotiable
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
1000m per week
Delivery Time :
depends on your order quantity
Packaging Details :
Standard Export Package
Nominal ID of host pipes :
50mm (2 inches)— 800mm (32 inches)
Maximum length of each installation :
up to 4000m (13,000ft)
Maximum operating pressure :
1.0 - 4.0 Mpa (150psi-600psi)
Maximum bursting pressure :
3.0-12.0 Mpa (450psi-1800psi)
Installation mode :
Pull in U-shape Liners
Temperature of Media :
- 40℃ to 75℃( - 40°F to 167°F)
Raw materials :
High tenacity fabric reinforcement layer + Abrasion-resistant PE cover + Air - tight PU tube
Service Life Duration :
40 Years
Description

G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

Pipe-in Liners are classified into four different series: Pipe-in Liner W Series, Pipe-in Liner O Series, Pipe-in Liner G series, and Pipe-in Liner H series.

►Pipe-in Liner W series are used to rehabilitate pressure pipelines, including water main pipes and force mains at normal temperature.

►Pipe-in Liner O series are used to rehabilitate oil pipes both onshore and offshore.

►Pipe-in Liner G series are used to rehabilitate gas pipes both onshore and offshore.

►Pipe-in liner H series are used to rehabilitate pipes in municipal heat system. Pipe-in liner H series can resist a temperature up to 95° C (203° F).

Furthermore, Asoe is the first company in the world to develop this type of solution to rehabilitate hot water pipes.

Besides liners, Asoe also supplies complete solutions and accessory equipment, including couplings to connect Pipe-in Liner with host pipes, equipment to install couplings, and technical consulting etc.

Pipe-in Liner solution is a semi-structurally independent rehabilitation technology. There is no connection between the host pipe and the liner; the liner works independently from the host pipe. The liner is rigid and maintains the round shape inside the host pipes when there is a vacuum inside the host pipe or when there is temporary external pressure on the host pipe.

G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

ASTM installation guide and design guide are available upon request.

Connectors (PILC Couplings, Patent Protected)

G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

•Choose section of host pipes to be rehabilitated

•Install by-pass hoses in order to keep transferring flow during

rehabilitating

• Dig construction pits at two ends

• Inspect pipes with a mobile TV camera and analysis of video recordings

• Mechanical coarse cleaning of host pipes with scraper pigs

• Clean host pipes by water jetting

•Position Pipe-in Liners at the start pit and the pulling winch at

destination pit

• Install pulling head onto liner

• Install hose guides

• Fold Pipe-in Liner into U-shape and bind the liner with scotch tape

• Pull liner into the host pipes

• Install PILC couplings onto the host pipes

• Hydrostatic pressure test or air pressure test

• Install transition pipes

• Recover transferring fluid

• Remove by-pass and close pit

G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

In order to purchase correct liners to rehabilitate host pipes, the following information is required:

1. Normal operating pressure and temperature;

2. Media transferred inside the host pipes, such as

water,oil,gas, hot water, chemicals etc.

3. Materials and actual ID of host pipes, number of

bends,degrees of bends, etc.

4. The length of each section of host pipes which

Are supposed to be rehabilitated.

Pipe-in Liners hold the pressure from inside but not from outside.The host pipes must be able to hold the pressure from outside. If the host pipes collapse, Pipe-in Liner solution is not recommended.

G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

1. Rehabilitating host pipes which can’t be repaired by digging

2. Free of maintenance after installation

3. Liners can be used in up to 45° bend or 90° bend with a 5D radius

4. Resist higher pressure from inside

5. Small working zone and limited requirement on the conditions of host pipes

6. Less influence on surrounding environment during installation

7. No chemical expoxy resin needed and no air pollution

8. Quick installation

9. Super long-distance installation at one time


G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

Send your message to this supplier
Send Now

G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

Ask Latest Price
Brand Name :
ASOE
Model Number :
Pipe-in Liner G Series
Certification :
ISO
Place of Origin :
China
MOQ :
10cm
Price :
Negotiable
Contact Supplier
G Series Trenchless Pipe Lining For Gas Pipes Rehabilitation Small Working Zone

Asoe Hose Manufacturing Inc.

Active Member
6 Years
shanghai, shanghai
Business Type :
Manufacturer
Total Annual :
30000000-40000000
Employee Number :
120~300
Certification Level :
Active Member
Contact Supplier
Submit Requirement