2" inch Blue Lay Flat Water Pump Discharge Hose 60' feet
Welline is one type of through-the-weave polyurethane (PU) covered hoses which are made of PU materials approved according to NSF 61 standard.
Welline hoses shall be made from 100% high tenacity virgin synthetic yarn circular woven and completely, totally embedded in the PU compound, excellent protected against mechanical damage, forming a single homogenous construction without the use of any glues or adhesives of any type.
The structure of Welline ensure that exposure to seawater and contamination by most chemical substances, hydrocarbons, oils, alkalis, acids and greases must have no effect on the short or long term performance of Welline hose.
Structure
■No money and time to waste on transporting, installing and maintaining rising main
Technical Specification on Welline
Welline™ PU Layflat Hoses
|
|||||||||
ID
|
Wall Thickness
|
Weight
|
Working Pressure
|
Bursting Pressure
|
|||||
Inch
|
mm
|
Inch
|
mm
|
lbs/ft
|
kg/m
|
PSI
|
bar
|
Kg
|
Lbs
|
1 1/2
|
39+1.5
|
0.1
|
2.4
|
0.22
|
0.33
|
425
|
30
|
920
|
65
|
2
|
52+1.5
|
0.1
|
2.4
|
0.37
|
0.55
|
425
|
30
|
920
|
65
|
2 1/2
|
65+1.5
|
0.11
|
2.9
|
0.41
|
0.61
|
425
|
30
|
920
|
65
|
3
|
77+2.0
|
0.1
|
2.5
|
0.64
|
0.95
|
390
|
27
|
860
|
60
|
4
|
104+2.0
|
0.13
|
3
|
0.94
|
1.4
|
380
|
26
|
840
|
58
|
5
|
128+2.0
|
0.15
|
3.8
|
1.14
|
1.7
|
360
|
25
|
800
|
55
|
6
|
155+2.5
|
0.15
|
3.8
|
1.68
|
2.5
|
360
|
25
|
800
|
55
|
8
|
204+3.0
|
0.17
|
4.3
|
2.3
|
3.4
|
260
|
18
|
645
|
45
|
Applications
Mining Dewatering
Fresh Water Supply Solutions in mines
Water utilities
Agriculture
Groundwater rising
Sports field, playgrounds and parks
Residential wells
Industry water supply
Appraisal wells
Water monitoring
Installation
■ Assembly hoses with HPHC BSP coupling
■ Swivel HPHC BSP coupling onto submersible pumps
■ Attach power cable using Welline Cable Straps
■ Hang Welline hoses and pumps
■ Lower Welline hoses and pumps into well
■ Assembly the other end of hoses onto HPHC BSP coupling
■ Swivel top HPHC BSP coupling onto Well Head Base
■ Fix Well Head Base
■ Install elbows, valve and other output pipes
For some large boreholes, vehicles and cranes are required to assist installation.