The painting line use electric transfer cart powered by the 36V single-phase (three phase) low voltage rail, which through sliding wire to complete. Ground step-down transformer control cabinet will be single phase (three phase) AC 380V step-down to single-phase (3Phase) 36V, sent to the flat car by the rail sliding wire, and then step-up (three phase) single-phase AC 380V by step-up transformers on the cart, provide electricity for the single-phase capacitor motors which used in the cart.
Model | BDGS-2t | BDGS-20t | BDGS-50t | BDGS-100t | BDGS-150t | |
Rated Load(t) | 2 | 20 | 50 | 100 | 150 | |
Table Size(mm) | Length(L) | 2000 | 4000 | 5500 | 6500 | 10000 |
Width(W) | 1500 | 2200 | 2500 | 2800 | 3000 | |
Heigth(H) | 450 | 550 | 650 | 850 | 1200 | |
Wheel Base(mm) | 1200 | 2800 | 4200 | 4900 | 7000 | |
Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 2000 | 2000 | |
Wheel Diameter(mm) | 270 | 350 | 500 | 600 | 600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance(mm) | 50 | 50 | 50 | 75 | 75 | |
Running Speed(min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-18 | |
Motor Power(kw) | 0.8 | 2.5 | 5.5 | 11 | 15 | |
Transformer Power(KVA) | 3 | 6.8 | 10 | 30 | 30 | |
Transformer Quanity | 1 | 1 | 1 | 1 | 1 | |
Running Distance(m) | 70 | 70 | 50 | 50 | 50 | |
Max Wheel Load(KN) | 14.4 | 77.7 | 174 | 343.8 | 265.2 | |
Reference Weight(t) | 2.8 | 5.9 | 8 | 14.6 | 26.8 | |
Recommended Rail Model | P15 | P24 | P43 | QU100 | QU100 |
The hot metal transfer cart in shot blast booth is applied in steel mill to transfer steel coils, metallurgy coils. With hydraulic lifting device, it can lift up or put down the coils freely.
For convenience, hot metal transfer cart in shot blast booth is remore control. In order to ensure operator' safety, the V- frame can be added on the platform of the cart.
We can recommend you a suitable V-frame to you according to the coil dimension, coil weight, etc.
Packing Details : The whole painting line use transfer cart is packed by the tarp, the parts will be packed by polywood case
Delivery Details : 3-30 days after order of Solid bicycle tire tubes
Our commitment: The load bearing safety factor of the electric transfer cart is no less than 120%.
Freely design the auxiliary device or foundation drawing, and offer the technical service and drawing material.
16 hours engineering service and 24 hours internet service for our customers.
During the warranty period, if our electric transfer cart can't work normally, we can support you repair technology or replace relevant parts for you within 24 hours.
Solving the quality problem within 24 hours, serious attitude from beginning to end. Value the reputation and Preserve the image of our company.