Heavy load billet industry workshop battery operated rail trolley is composed of frame, transmission device, driving wheel group, driven wheel group, buffer device, maintenance-free battery, electrical equipment and safety protection device. The whole cart design makes the flat cart easy to transport, stable and safe in operation, and has no faults such as rail jamming and derailment. The lubrication points are well sealed, and there is no oil dripping, oil leakage and other faults.
Rated load (T) | 2 | 10 | 20 | 30 | 50 | 63 | 150 | |
Table size | length(L) | 2000 | 3600 | 4000 | 4500 | 5500 | 5600 | 10000 |
Width(W) | 1500 | 2000 | 2200 | 2200 | 2500 | 2500 | 3000 | |
Height(H) | 450 | 500 | 550 | 600 | 650 | 700 | 1200 | |
Wheel Base (mm) | 1200 | 2600 | 2800 | 3200 | 4200 | 4300 | 7000 | |
Rail Inner Gauge (mm) | 1200 | 1435 | 1435 | 1435 | 1435 | 1435 | 2000 | |
Wheel Diameter(mm) | Φ270 | Φ300 | Φ350 | Φ400 | Φ500 | Φ600 | Φ600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance (mm) | 50 | 50 | 50 | 50 | 50 | 75 | 75 | |
Running speed (min) | 0-25 | 0-25 | 0-20 | 0-20 | 0-20 | 0-20 | 0-18 | |
Max Wheel Load (KN) | 14.4 | 42.6 | 77.7 | 110.4 | 174 | 221.4 | 265.2 | |
Reference Weight (t) | 2.8 | 4.2 | 5.9 | 6.8 | 8 | 10.8 | 26.8 | |
Recommended Rail Model | P15 | P18 | P24 | P38 | P43 | P50 | QU100 |
The electric power material handling transfer carts are widely applied in assembly line (ring production line, loop production line), metallurgy industry (steel ladle), warehouse transport, ship industry (maintenance, assemble, container transport), workpiece transport in workshop, lathe transport, steel factory(steel billet, steel plate, steel coil, steel pipe, section steel, steel structure), construction(bridge, simple building, concrete, concrete column), petroleum industry(oil pump, sucker rod and parts), energy(polycrystalline silicon, generator, windmill), chemical industry(electrolytic cell, retort etc), railway(rail maintenance, rail welding, train tractor).
Q: What is the leading time, delivery term, and payment term?
A: Usually our leading time is 30 days.
tags:steel plant steerable transfer vehicle,steel plant rail vehicle