Automatic Control Solar Strut Roll Forming Machine Hydraulic Cut Best Service
1. Main structure and characters
This channel machine is composed by 3T passive uncoiler punching station, main forming machine,cutting unit, hydraulic station,computer cabinet,output table.
One machine can produce several shape products as panel profile.
The different size of channel is adjusted by the spacers between up and downside rollers. Because the design of these spacers is half circle, then two joint together, so when adjusting, needn’t remove the rollers, so it is very easy and convenient.
Due to cutting after forming, so when change different specification, need to change the cutting mould.
2. Technical Parameter
Item No. | Description | Offered specification |
1 | Suitable material thickness | 1.0-2.5mm |
2 | Raw material | Galvanized coils yield strength≤G250MPa |
3 | Product Line speed | 14m/min(not include cutting and punching stop time) |
4 | Levelling device | 7 roller levelling including 3 top rollers and 4 bottom rollers |
5 | Roller stations | 13-19 stations |
6 | Roller material | bearing steel, quenching treatment |
7 | Shaft diameter | 75mm ,material is 45# forge steel |
8 | Transmission | By chain 1.2 inch 20A double chain with longer shafts |
9 | Material of chain | 45# forged steel with frequency quenching, 12A |
10 | Material of cutting | Cr12Mov with quench HRC58-62 |
11 | Main motor power | 7.5kw |
12 | Motor power of hydraulic station | 4kw |
13 | Hydraulic station pressure | 12Mpa |
14 | Tolerance | 6m+-1.5mm |
15 | Frame | H Beam |
3. Working Flow of Solar Strut
Decoiler----Feeding and Leveling---Roll forming---Hydraulic punching---Cutting---Run out table
4. Commissioning of the machine
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
The commissioning comprises:
- Commissioning by Suhang service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance
Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test blocks
- Transport and lifting devices
The operators of the plant should be present during the commissioning in order to become familiar with the new machines.
5. Our advantage:
(1) This production line is high performance-------It's suitable for the various size product
(2) New design----------New developed automatic for different type ceiling t grid.
(3) Roll forming machine is perfect------------Can use 10 years or longer
(4) Length control----------NC control with the sensor
(4) Price --------------it is reasonable (welcome you send mail for asking the price)
(5) Technic support------------10 years technican give you strong and timely support.
6. After-sell service
A. Foreign debugging
If you need, we will arrange our professional engineers to help you install and debug the machines well. Buyer should pay $60 per day
B. Guarantee period
The warranty will be maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts free of charges, which is in the conditions of correct operation. (Natural disasters or factors which can’t forced by human are excluded).
C. Training
During installation and adjustment of the equipment, our engineers shall provide the training to
buyer’s personnel request to operate and maintain the equipment. Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc.
D. Lifetime services
Life time services to every customer.
7. Picture