WARELIGHT AREA/PARKING LOT LIGHT, 300W, 5000K, ALUMINUM HOUSING, 0-10V DIMMABLE
SPECIFICATIONS
Cetus series is the best alternative for traditional street and area lighting with quick payback and improved performance. The precise optics combined with the high CRI LED chips bring out the high-efficient, uniform lighting for both the roads and the security cameras in these critical areas while minimizing light spill. The adjustable installation adaptor provide the seamlessly retrofit into existing areas:
Rugged Design
High brightness - 170lm/W
High-Efficiency Heat Dissipation Design
Tool-free Maintenance
Smart Wireless Control
Integrated Gradienter on the lamp
10KV Surge protection
Input Voltage | AC100V-240V 50/60HZ |
Housing | Aluminum |
LED Brand | Lumileds 5050 |
Driver | Meanwell, Sosen, Inventronics |
CRI | Ra>70 |
Sensor | Motion Sensor;dayight Sensor |
Operating Temp | -40℃~ 50℃ |
CCT | 3000K 4000K 5000K 5700K 6500K |
MODEL | SG-CT- 50W | SG-CT-100W | SG-CT-150W | SG-CT-200W | SG-CT-300W |
POWER | 50W | 100W | 150W | 200W | 300W |
LUMEN OUTPUT | 8500LM | 17000LM | 25500LM | 34000LM | 51000LM |
Rugged Design
Durable and stable in rugged environment
it is one the best choices for the roadway lighting.
Compatible with SOGA Wireless Smart Control
SOGA Wireless Smart Control makes the light more
intelligent,with which you can easily control each lamp
just at your fingertips. Please contact your SOGA sales
to get detailed instruction
FAQ:
Q1. What about the VS lead time ?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than.
Q2. Does VS have any MOQ limit for LED Lights order ?
A: Low MOQ, 1pc for sample checking is available.
Q3. How do you ship the goods and how long does it take to arrive ?
A: We usually ship by DHL, UPS, FedEx or TNT. Airline and sea shipping also optional.
Q4. How does VS proceed an order for LED Fin High Bay Lights ?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.