AC100-277V Massive Aluminum Round Highbay For Warehouses
Benefits
• Replacement for HID and HPI 250/400W high bay light
• Energy saving over 50%
• Environmental protection, no pollution
• Significant reduction in installation & maintenance cost
• Great reduction in shipment cost as small measure
Features
• Samsung 3030 SMD LED, luminaire light efficiency 110lm/w
• Mean well driver, IP65 and 5 years warranty
• Aluminum heatsink with fins, bigger heat radiating area
• With big aluminum PCB and SMD, better heat dissipation
• Consistent color rendering (CRI) > 80
• Warranty: 5 years
Product Specification
Specification for 110lm/w IP65 black round ufo highbay led 200w | ||
General Information |
Product Type | highbay led 200w |
Product Size | φ342*192mm | |
Product Color | Black or silver | |
Electric parameter | Driver Brand | Meanwell HBG Series |
Input Voltage | AC90-305V/50-60Hz | |
Power | 200W | |
PF | >0.95 | |
Optical Parameter | LED Brand | Samsung 3030 |
CRI | >80 | |
Color Temperature (CCT) | 2700K-7000K | |
Luminous Flux | 22000lm±5% | |
Luminous Efficiency | 110lm/w | |
Beam angle | 15°/30°/60°/90°/120°/150° | |
Others | Lifetime | 50,000Hr |
Operating temperature | -40℃~50℃ | |
Warranty | 5 years | |
Materials | AL housing+tempered glass +AL board | |
Installation | Suspending | |
Application | Industry, warehouse, station, gymnasium |
FAQ
1. Q: Where is your target market?
A: Our products have been exported to Middle East, Southeast Asia, South America and Europe and so on, we are sure we can meet your market demands.
2. Q: What is your MOQ?
A: Depends on the product .Usually the MOQ is 1pcs.
3. Q: How long is the sample production time?
A: About 4-7days. Butif you want a specialsample, it will need some times to make the mold.
4. Q: What is the Payment?
A: Usually we adopt the T/T, and we have 3 ways:
1) 30% advance deposit, the Balance should be paid off before shipment.
2) 30% advance deposit, 30% payment before shipment, 40% payment again the B/L copy.
3) 50% advance deposit, the Balance should be paid off after received B/L copy in 3 days.
But if you want to adopt other payments, it will depend on your order quantity.
5. Q:How long is the delivery time?
A: About 7 days