Desktop power adapter 48V 3A switching power supply DOE VI CE UL GS marked
Specification:
Parameter | 48v3a |
AC Input | |
Nominal Input Voltage | AC 100V~240V |
Input Voltage Range | AC 95V~265V |
Input Frequency | 50/60Hz |
DC Output | |
Output Voltage | 48V |
Output Current | 3A |
Output Power | 144w |
DC Connector Size | 5.5*2.5/5.5*2.1/USB/2.5*0.7/3.5*1.35 |
Line Regulation | 2% |
Load Regulation | 5% |
Ripple Noise | 180 Mvp-p |
Efficiency | >85% |
Output Cable Standard | 0.35mm2 Pure Copper |
Output Cable Length | 1m normally or customized requirement(1.2M,1.5M,1.8M,2M) |
Environment | |
Operating Temperature | 0°C ~40°C |
Operating Humidity | 5%~95%RH |
Storage Temperature | -20°C ~85°C |
Storage Humidity | 5%~95%RH |
Protection | |
Over Load Protection | Short Circuit Protection |
Over Current Protection | Over Temperature Protection |
Certificates | |
CE, ROHS, REACH, FCC, ERP, CB, GS, TUV, CCC,PSE | |
Dimensions | |
PCS/CTN | 50PCS |
Outer Carton Size | 48.5*32*40CM |
GW/CTN | 28kg |
Package | |
Inner Box | Normally white box or PE BAG or customized requirement |
Outer Carton | Normally neutral standard carton or customized requirement |
Warranty | |
Warranty | 1 year |
Manufacturing Process | |
1. Set-Up→2. Hand Insertion→3. Wave Soldering→4. Touch-Up→5. V/I→6. ICT→7. INT→8. Apply Glue→9. Q/A→10. Entering Stock→ 11. Assembly→12. Power On Test→13. Hi-Pot Test→14. Burn-In→15. Hi-Pot Test→16. All Fun Test→17. Packing→18. OQC→19. Shipping |
1:Our service
1) Any inquiries will be replied within 24 hours
2) Professional manufacturer.
2. OEM/ODEM available
1). Silk print logo on the power adapter;
2). Customized power adapter housing;
3). Any your idea on the power adapter we can help you to design and put it into production
3. High quality,reasonable & competitive price ,fast lead time.
4. After-Sale Service
All power adapters have 2 years warranty ,if any default units ,take some pictures,we will replace the related quantity.
5. Faster delivery
Sample order in stock ,will be sent out in 2-3 days after confirmation, and 7-12 working days for bulk production.