Incoming Raw Material Inspection and 6 steps inspection during production
1. Led photoelectric parameter test
2. First sample inspection before mass production
3. Machine inspection after reflow soldering (half- finished products).
4. Aging test for 12- 24 hours (100%)
5. 100% test of opelectronic parameters (finished products)
6. Random inspection (10-20%) before shipment
1. SMD LED capsulation,control of brightness,color temperature(Bins),photoelectricity test ( 1st test ).
2. SMD attached on PCB with Automatic machine, samples by manual work.
3.Bake to dry.
4.Light up test ( 2nd test ) after baking.
5.Soldering each 50 cm PCB to 5 meters,wires soldering by manual work.
6. Aging test ( 3rd test ) at least 8 hours.
7.Separate the led strips to each reel ( 5meters )
8. Paste 3M tape onto the led strips.
9. Testing ( 4th test ) before packaging for IP20 led strips.
10. Repair work when discover drawback.
11. Led strips IP66 with empty tube production and test ( 5th test ).
12. Led strips IP65 with dropper glue and test ( 5th test ).
Qualty control process: