Construction of flexible grounding body
(1) Flexible grounding body is a kind of compound formula product. It includes: conductive agent, preservative, blending agent, flexibility agent, channel agent, coagulant, catalyst, etc.
(2) First dig the grounding trench, weld the horizontal grounding body, and the vertical grounding electrode.
(3) Open the lid of the barrel and take off the two bags of raw materials stuck to the inner lid.
(4) Open the plastic bag and turn the plastic bag over to the outside of the barrel with a wooden stick into the barrel to stir the sediment and liquid. (When the temperature is low, you should use a heating rod to warm up the liquid in the barrel to about 30 degrees)
(5) Open the two external bags of raw materials and add them to the liquid and stir well, and take them to the edge of the ditch, or the pit, to be used.
(6) As vertical pouring can be poured directly.
(7) If you do horizontal pouring, you need to keep stirring slowly until the resistance of the liquid in the barrel increases and becomes sticky like porridge, then pour it into the trench to wrap the horizontal grounding body and form a long line of pouring while pouring.
(8) wait for its solidification to form with elastic grounding conductor, at this time will no longer dissolve in water, can be backfilled, the construction of flexible Hunan Hertz-Ohm Engineering Group Co., Ltd. 4 grounding body thus ended
(9) Backfill the grounding trench, and clean up the site garbage, measure the qualified can record the results and then leave the site