4FT tri-proof light 60w Dust Proof Fixtures AC347V-480V for Railway Station
Description
Mounting: Mounting surface or suspended
Operation temperature: -20 degrees to 40 degrees
Power
60w
Features
Life time over to 50000 hours
Multiple mounting option
Specification
Model | Input | CCT | Power | Size | LPW | Lumen | Linking |
AN-SF-4FT-40-03 | AC347-480V | 3000K,3500K,4000K,5000K | 40W | 4FT | 120-150LM/W | 5600LM | 600W/120V, 600W/277V |
AN-SF-4FT-60-03 | AC347-480V | 3000K,3500K,4000K,5000K | 60W | 4FT | 120-150LM/W | 8500LM | 600W/120V, 600W/277V |
Construction
PC covers + Aluminum housing body
Translucent white cover or clear cover optional
Universal voltage 100-347V
Connection
Input cord with male connector
Maximum series connection power 600W/120V
Maximum series connection power 600W/277V
Product Benifits
Operational
3X greater lamp life than fluorescent, supported by industry-leading 5 years warranty
50000 hours lamp life reduces long-term maintenace costs
Sealed, vapor-tight, water-resistant, IP65 fixture
Sustainability
Lack of UV or IR minimizes concerns with fading or discoloration
Mercury-free, allowing for non-hazardous disposal
Safty
High shock resitance
Negligible light depreciation over time
Superior light output
Tamper-Proof Housing
Application
Warehouses
Parking Garages
Wet Environments & Walkway Canopies
Harsh Evironments
Hospital
School and Gymnasiums
Recreation centers
How to Install
Parts
About our Driver
About Us
Aina-4 Technologies (Shanghai) Co., Ltd. is a private limited company registered in Shanghai, China. It specializes in the R&D, design, manufacture, and marketing of light emitting sources and lighting fixtures. It is an enterprise formed by four (4) pioneer lighting companies, putting their resources together to produce products and services that create sustainability not only for the environment, but also for the economies and societies that the company grows with.
FAQ
Q1. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality . Mixed samples are acceptable
Q2. What about the lead time?
A: Sample needs 3-5 days. Mass procution time needs 1-2 weeks.