Specifications
Brand Name :
Zhonghe
Model Number :
CLB01
Certification :
CE
Place of Origin :
China
MOQ :
1
Price :
Negotiate
Payment Terms :
T/T, discussion
Supply Ability :
60 pcs per month
Delivery Time :
10-15 working days
Packaging Details :
Wooden case, bubble bag or iron frame support
Type :
excavator boom arm for pile driving
Condition :
Good & new
Warranty :
180 days
After-sales service provided :
quick reply online
Maximum length :
13.5-20 meters
Counterweight :
Up to your model
Drilling Angle :
Adjustable
Drive System :
Hydraulic
Product Name :
Excavator Pile Driving
Structure :
Integrated
Description

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Catalogue ZH excavator boom arm.pdf

ZHONGHE excavator pile driving boom

The pile driving arm of the excavator uses the high-frequency vibration of the vibration hammer to transfer to the pile with high speed and downward force, resulting in the liquefaction of the soil structure around the pile due to the vibration, so as to reduce the friction resistance between the pile and the soil. Then the pile is sunk into the soil through the pressure of the excavator, the vibration hammer and the weight of the pile, so as to ensure the perpendicularity and spacing accuracy of each column. This not only reduces the deflection of the posts, but also increases the overall stability of the fence.

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Zhonghe excavator pile driving arm’s advangtages

1. Q355B as default, Q690D optional.

2. Key Force-bearing Parts are Reinforced.
3. Welding is full and smooth.
4. Adopt national standard precision pipelines.
5. Boom bushing come with an alloy copper sleeve(with self-lubricating carbon powder inside).

6. Boom and sticks' angle can be opened to achive 160°

Zhonghe excavator pile driving features :

  1. High power hydraulic hammer: Zhonghe's pile driving attachments are equipped with high power hydraulic hammers that can deliver high impact force, allowing the attachment to drive piles to a range of depths and in a variety of soil conditions.

  2. Customizable design: Zhonghe offers a variety of pile driving attachments that are customizable to meet the specific needs of different excavator models and job site requirements. This can improve efficiency and reduce the need for additional equipment.

  3. Easy installation: Zhonghe's pile driving attachments are designed for easy installation, reducing downtime and labor costs. The attachment can be quickly and easily attached to the excavator without requiring additional welding or assembly of loose parts.

  4. Versatility: Zhonghe's pile driving attachments are designed to be versatile and can be used in a variety of soil conditions, including hard rock, clay, and sand. They are also able to drive piles to a range of depths, depending on the length of the boom and the power of the hydraulic hammer.

  5. Safety features: Zhonghe's pile driving attachments are designed with safety features such as a locking mechanism that prevents the hammer from drifting or slipping during use, reducing the risk of accidents and injuries on the job site.

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

ZHONGHE excavator pile driving arm configuration


Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Zhonghe Machinery Main Product

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Company profile

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

TOP PICKS

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving ArmCustom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving ArmCustom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

ZHONGHE MACHINERY'S ADVANTAGES

1. 14000㎡ Workshop with Precision Equipments

We has more than 14000㎡ steel structure standard workshop with a large number of high precision processing equipments.

2. High-tech R&D Team

We use precision drawing software to achieve the max working range under the premise of safe operation.

3. Customization

(1)Match all brand excavator.
(2)Color, length, material can do according to you.
(3)Extra pipeline can be added to suit to some extra application.

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

CERTIFICATIONS

CE certification & Utility model patent certificatesCustom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

ZHONGHE MACHINERY'S ADVANTAGES

1. 14000㎡ Workshop with Precision Equipments

We has more than 14000㎡ steel structure standard workshop with a large number of high precision processing equipments.

2. High-tech R&D Team

We use precision drawing software to achieve the max working range under the premise of safe operation.

3. Customization

(1)Match all brand excavator.
(2)Color, length, material can do according to you.
(3)Extra pipeline can be added to suit to some extra application.

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

CERTIFICATIONS

CE certification & Utility model patent certificatesCustom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Zhonghe excavator pile driving arm’s advangtages

1. Q355B as default, Q690D optional.

Send your message to this supplier
Send Now

Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Ask Latest Price
Watch Video
Brand Name :
Zhonghe
Model Number :
CLB01
Certification :
CE
Place of Origin :
China
MOQ :
1
Price :
Negotiate
Contact Supplier
video
Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm
Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm
Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm
Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm
Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm
Custom Made Quick Production Time 21 Meters Pile Foundation Excavator Pile Driving Arm

Kaiping Zhonghe Machinery Manufacturing Co., Ltd

Verified Supplier
3 Years
guangdong, jiangmen
Since 2018
Business Type :
Manufacturer, Seller
Total Annual :
1500000-2200000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement