Single Phase LCD Digital Display Lora Wireless Lorawan IoT Smart Electric Energy Meter for Energy Measurement
Standards | IEC62053-21, IEC62052-11, DL/T645-2007 220 |
Voltage(V) | 220 |
Current(A) | 5(60)A/0.25~0.5(60)A |
Pulse constant(imp/kWh) | 3200 |
Active measurement accuracy | Class B/1 |
Reactive measurement accuracy | Class 2 |
Frequency | 50Hz |
Power consumption | ≤1.5W |
Specified range | 0.9Un ~ 1.1Un |
Expansion range | 0.8Un ~ 1.15Un |
Limit range | 0.6Un ~ 1.2Un |
Specified temperature range | ≤±1s/d |
Reference temperature(23℃) | ≤±0.5s/d |
Active power(Class 1) | ≤0.004lb |
Reactive power(Class 2) | ≤0.005lb |
Specified working range | -25℃~+60℃ |
Operating limit range | -40℃~+70℃ |
Storage and transportation | -40℃~+70℃ |
Annual average relative humidity | < 75%RH |
Natural distribution within 30 days of a year | 95%RH |
Occurs occasionally in other days | 85%RH |
LoRaWAN frequency | CN470,RU864,IN865,EU868,US/AU915,KR920,AS923.1/2/3/4, Custom Channels |
The electric energy meter adopts LCD display. It can indicate the cumulative total electricity consumption
and electricity consumption at various rates of the current and last January to last December.
Status indicator lamp
The electricity meter uses a bright, long-life LED as a pulse indicator light.
It has active power pulse indicator light: red, usually go out, flashing when measuring active power.
LoRaWAN/Cat.1 Module status indicator: green. Always on indicates online, and flashing indicates going online.
Among them, 5 and 6 are reactive pulse output (empty). 7 and 8 are active pulse output. 9 and 10 are clocks. 11 and 12 are RS485.
Live installation of wiring is strictly prohibited!
The electricity meter shall be installed indoors as far as possible. Special instrument box protection shall be used for outdoor installation. The installation bottom plate shall be fixed on the wall with strong fire resistance and not easy to vibration. There must be no corrosive gases in the surrounding air where the meter is installed. Avoid dust, salt spray, etc.
When using the electricity meter, the wiring must be conducted strictly according to the wiring diagram in the tail cover of the meter. It is recommended to use copper wire for the lead connected to the terminal seat. The screws of the fixed lead in the terminal seat should be tightened to avoid burning the electricity meter due to bad contact and heating.