Product Name | Alloy Steel Pipe |
Process | Hot Rolled, Cold Drawn , Hot Expanding |
Standard | API 5L, API 5CT, ASTM A106/A53, ASTM A519, JIS G 3441, JIS G3444, JIS G3445 DIN 2391, EN10305, EN10210, ASME SA106, SA192, SA210, SA213,SA335, DIN17175, ASTM A179… |
Certificate | API 5L PSL1 / PSL2, API 5CT, ISO 9001-2008 |
Out Diameter | 1/8 – 36inch (10.3-914.4mm) |
Wall Thickness | 1.73-40mm |
Length | Random Length, Fixed Length, SRL, DRL |
Steel Grade | |
API 5L PSL1 / PSL2 | GR B, X42, X46, X52, X56, X60, X65, X70, X80 |
ASTM A53/A106 | GR A, GR B, GR CASME |
ASME SA106 | GR A, GR B, GR C |
SA192 / SA209M | T1, T1a |
ASTM A335 | P1, P2, P5, P9, P11, P22, P23 |
ASTM A333 | Gr.1, Gr.3, Gr.4, Gr.6, Gr.7, Gr.8, Gr.9, Gr.10, Gr.11 |
Mill Test Certificate | EN 10204/3.1B |
Description of application effect
Alloy steel is steel that is alloyed with a variety of elements in total amounts between 1.0% and 50% by weight to improve its mechanical properties. Alloy steels are broken down into two groups: low-alloy steels and high-alloy steels. The difference between the two is somewhat arbitrary: Smith and Hashemi define the difference at 4.0%, while Degarmo, et al., define it at 8.0%.Most commonly, the phrase "alloy steel" refers to low-alloy steels.
Strictly speaking, every steel is an alloy, but not all steels are called "alloy steels". The simplest steels are iron (Fe) alloyed with carbon (C) (about 0.1% to 1%, depending on type). However, the term "alloy steel" is the standard term referring to steels with other alloying elements added deliberately in addition to the carbon. Common alloyants include manganese (the most common one), nickel, chromium, molybdenum, vanadium, silicon, and boron. Less common alloyants include aluminum, cobalt, copper, cerium, niobium, titanium, tungsten, tin, zinc, lead and zirconium
Q: Do you provide other steel pipes?
A: Xinyue's main products include ERW, LSAW, SSAW, SMLS, Scaffolding, Couplers and pipe fitting. And we provide carbon steel, alloy steel and stainless steel products.
Q: Is it OK to print customer’s logo on steel pipe product?
A: Yes. please inform us formally before our production and confirm the design.
Q: How long is your delivery time?
A: Generally it is 10-15 days for the stock products. And 20-30 days if the goods are not in stock, according to quantity requirement. And sooner if you can accept partial department.
Q: Whats your payment term?
A: We accepy 30% deposit, 70% balance against the copy of B/L, T/T or LC at sight, etc.