XY-2BLB Crawler Mounted Medium-Shallow Diamond Core Drilling Rig
ADD: NO.1 Kuaileli, Xiaolongkan Street, Shapingba District, Chongqing China;
Skype: lucyfang9 ; Website: www.lucydrillingrig.com; email: lucyfang15@yahoo.com;
M.: +86-13628481197 TEL:+86-15111813754 , 15923510719
Application:
XY-2BLB rig is developed based on our XY-2B core drilling rig , integrating drilling rig, crawler, console rack and other devices into the integral one. It is mainly targeted at the shallow-medium hole of geology core drilling, and where the mobility is important. It is modular and integral drilling rig.
Feature:
1. Integrated crawler, rig, mud pump, console racks;
2. Crawler, the whole support rigs and tower with ups and downs are controlled by the hydraulic system of the rig, easy to operate and transport;
3. The whole set of equipment can move to relocate, improve drilling efficiency, reduce labor intensity;
4. The tower has the function of ups and downs , folding , easy walking and transportation;
5. Rig with more (8 block) the speed of progression and reasonable speed range, and the relatively large low-speed torque, wide range of application.
6. Rig has two reverse gear speeds, easy to deal with incidents;
7. Rig has longer feed stroke as long as 600mm, will help improve drilling efficiency and reduce blocking drill, burning accidents;
8. Rig has double oil pump, less power consumption, lower oil temperature of hydraulic system;
9. Rig has few control levers, rational layout, flexible and reliable operation;
10. In addition there is a normally closed upper hydraulic chuck on , but also with lower mechanical man-powered chuck.
Main technical specifications:
1 | AW rod | 530 m | ||
BW rod | 420 m | |||
NW rod | 320 m | |||
AQ rod | 565 m | |||
BQ rod | 460 m | |||
NQ rod | 350 m | |||
HQ rod | 250-300 m | |||
Φ73 rod | 100 m | |||
Φ60 rod | 200 m | |||
Φ50 rod | 380 m | |||
Φ42 rod | 530 m | |||
2 | Spindle speed | Forward | 57; 99; 157; 217; 270; 470; 742; 1024 | |
Reverse | 45; 212 r/min | |||
3 |
| 3200 N·m | ||
4 |
| 60 KN | ||
5 | Spindle stroke | 600 mm | ||
6 | Max. lifting force of the hoist with single rope | 30 KN | ||
7 |
| 96 mm | ||
8 | Retraction distance | 305 mm | ||
| Retraction distance for the host drill rig | 330 mm | ||
| Retraction distance for both drill rig and tower | 160 mm | ||
10 | Oil pump | SCB32/12 double gear pump | ||
11 | Power unit | engine power | 30 KW 1500 r/min | |
electric motor | 22KW 1470 r/min | |||
12 | Mud pump | BW-250 | ||
13 |
| 1.2 km/h | ||
14 | Crawler Climbing capacity | no more than 25 ° | ||
15 | Tracked Ground pressure | 0.042 MPa | ||
16 | Rig height | 8 m | ||
17 | Hook load of the tower | 29.4 kN | ||
18 |
| 58.8 kN | ||
19 | Quantity of pulley | 2 pcs | ||
20 | Angle range of tower ups and downs | 0°~ 90° | ||
21 |
| (L*W*H) 4450×2166×3080 mm | ||
22 | Total weight | about 5500 kg |