Specifications
MOQ :
100piece
Price :
Negotiable
Payment Terms :
L/C, T/T, Western Union, MoneyGram
Packaging Details :
200piece/carton
Model Number :
figure number 240
Certification :
FM/UL
material :
ASTM A536
threads :
ASME B1.20.1, iso7-1,GB7306
size available :
1"-24"
surface treatment :
painted/electroplated/black/epoxy/hot-dip galvanized
certificate :
UL/FM approved
application :
fire protection,water supply, pulp transportation,etc.
specification :
grooved elbow, grooved tee, grooved cross, grooved coupling, etc.
Description

FM Approved Ductile Iron Grooved Pipe Fittings Grooved Concentric Reducer

Nominal
Size
mm/in
Pipe
O.D.
mm/in
Working
Pressure
PSI/Mpa
Dimensions
L
mm/in
Certificate
50x40
2x11/2
60.3x48.3
2.375x1.900
362.5
2.5
48
1.89
3C UL FM
65x25
21/2x1
76.1x33.7
3.000x1.315
362.5
2.5
50.5
1.988
3C UL FM
65x40
21/2x11/2
76.1x48.3
3.000x1.900
362.5
2.5
51
2.008
3C UL FM
65x50
21/2x2
76.1x60.3
3.000x2.375
362.5
2.5
52
2.047
3C UL FM
85x25
3x1
88.9x33.7
3.500x1.315
362.5
2.5
50
1.969
3C UL FM
85x40
3x11/2
88.9x48.3
3.500x1.900
362.5
2.5
52
2.047
3C UL FM
85x50
3x2
88.9x60.3
3.500x2.375
362.5
2.5
51
2.008
3C UL FM
85x65
3x21/2
88.9x76.1
3.500x3.000
362.5
2.5
70
2.756
3C UL FM
100x65
4x21/2
108.0x76.1
4.250x3.000
362.5
2.5
61.5
2.563
3C UL FM
100x80
4x3
108.0x88.9
4.250x3.500
362.5
2.5
68
2.677
3C UL FM
100x25
4x1
114.3x33.7
4.500x1.315
362.5
2.5
62
2.441
3C UL FM

1.We use Oxford Instruments spectrometer to check the chemical composition for every heat, components conform to the requirements of the

process before the iron.

2. Each casting ladle pouring tap on a block, tapping experiment was carried out, judge the inoculation

3. Ball reaction after strict control of pouring time, must complete pouring in 9 minutes, use time alarm system, overtime alarm, to prevent a

spheroidizing recession phenomenon

4. Strictly control the size of the groove, ensure compliance with standards

5. Grooved fittings surface coating epoxy resin, improve the ability to resist corrosion

6. Is advantageous to the construction safety, the system stability is good, easy maintenance

Material Ductile lron
Standard ASTM A536 Gr.65—45—12 EN1563.JIS G5502
Physical property Tensile strength>=310Mpa,Elongation>=10% Hardness<=150HB
Testing pressure 2.5Mpa
Working pressure 1.6Mpa
Surface painted
Color red, blue, white
Model Ductile iron grooved pipe fittings (Rigid coupling,45°elbows,grooved pipe fitting 90°elbows,reducing tee,grooved cross,flange coupling,cap ect.)
Connection Female, welding, flange
Shape Equal, reducing
Certificate FM,UL BSI,ANSI,ISO9001, 3C
Application Suitable for pipe connect of steam, air, gas, oil and so on
Buyer’s drawings or designs are available
Package Cartons without pallet
Cartons with pallet
Double woven bags
Or as buyer’s requirements
Delivery details According to the quantities and specifications of each order
Normal delivery time is from 30 to 45 days after receiving the deposit

FM Approved 	Ductile Iron Pipe Fittings Grooved Concentric Reducer

Send your message to this supplier
Send Now

FM Approved Ductile Iron Pipe Fittings Grooved Concentric Reducer

Ask Latest Price
MOQ :
100piece
Price :
Negotiable
Payment Terms :
L/C, T/T, Western Union, MoneyGram
Packaging Details :
200piece/carton
Model Number :
figure number 240
Certification :
FM/UL
Contact Supplier
FM Approved 	Ductile Iron Pipe Fittings Grooved Concentric Reducer
FM Approved 	Ductile Iron Pipe Fittings Grooved Concentric Reducer
FM Approved 	Ductile Iron Pipe Fittings Grooved Concentric Reducer

Leyon steel Co., Ltd

Active Member
8 Years
shanghai, shanghai
Since 2009
Business Type :
Manufacturer, Distributor/Wholesaler, Importer, Exporter, Trading Company, Seller
Total Annual :
10000000-50000000
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement