Marina Pedestal Stainless Steel Water Power Pedestal Yacht Marina Water Power Pedestal
Material: | |
Stainless steel | 300*250*1200mm |
Polyethylene | 380*380*1000mm |
Aluminum Alloy | 250*250*1200mm |
How to charge a yacht? And how to rehydrate?
1. The yacht can charge 50Hz,220V, or 380V, from 16A to 63A. Of course, there are also 60Hz,240V, or 400V electric system abroad;
2. Usually, yachts dock equipped with water and electricity tank, which can charge and supply water at the same time
Different marinas have different facilities, such as dry storage, which many small marinas do not have. But the core pontoon and supporting facilities should not be less. There were standards in 2014. Here are 8 standard facilities for marinas and yachts.
8 standard supporting facilities:
8.1 Power supply and lighting: The power supply system shall meet the electricity demand of yachts, fuel replenishment berths, sewage pumping stations, buildings, structures, navigation AIDS, process equipment, maintenance, and overhaul equipment, and dock lighting. The power supply voltage is 220V for a single-phase and 380V for three phases.
8.2 Water supply: Each yacht berth shall be equipped with a water supply port, and the water supply shall be measured independently. Two adjacent berths may share a water and electricity column.
8.3 Fire fighting: reliable fire fighting facilities shall be set up in refueling berths. A semi-fixed water cooling system and mobile foam extinguishing system should be installed in the fuel replenishment berth.
8.4 Communication: The marina shall set up public Internet telephone and network, and shall provide 24-hour telephone service. Set up a high-frequency radio station, coastal areas should cover A1 navigation. Perfect video surveillance system and intercom broadcasting system. Berths can also be set up according to the need for cable telephone, cable TV, network interface.
8.5 Navigation AIDS: perfect navigation AIDS (lighthouses) shall be set up at the marina.
8.6 Fuel replenishment: When there is no refueling facility for yachts near the marina, it is advisable to set up a special refueling berth in the port. The oil supply pipeline shall be equipped with an emergency shut-off valve at an appropriate position at the boundary between land and water and shall have the function of remote control and field operation.
8.7 Environmental protection: the marina should set up domestic garbage and sewage collection facilities, and the main pontoon should set up an adequate number of garbage cans. Sewage pumps and oil pollution pumps shall be installed at the sewerage collection berths.
8.8 Safety: Seine nets should be set up in the marina area, and an access guard should be set up at the entrance of the berth area. Set up land, water perimeter intrusion prevention system. The main pontoon should be equipped with a life buoy and emergency life box. A safety ladder should be set when the dry glare of the pontoon bridge is greater than 50cm.
In addition to the 8 standard facilities, there are also anti-wave/revetment, dry storage, maintenance room, management center, etc.