PVC Corrugated Roofing Sheet Equipment
This equipment is specially designed to produce the pvc corrugated roofing sheets, which has an excellent corrosion resistance, weather resistance, easy processing, low cost and many other characteristicsm abd is widely used for roof material of workshops, warehouses.
PAR T1 THIS LINE CONSISTS OF (COMPULSORY) | ||||
1 | Automatic spring feeding machine | 1 set | ||
2 | Conical twin screw extruder SJSZ-80/156 | 1 set | ||
3 | Single screw extruder SJ-45/30 or 65/30 for UV extrusion | 1 set | ||
4 | T-type /hanger type die head (JC-Times brand) | 1 set | ||
5 | Corrugation forming boards | 1 set | ||
6 | Cooling frame and edge cutting unit | 1 set | ||
7 | Haul off machine | 1 set | ||
8 | Plastic cutting machine-guillotine with meter counting | 1 set | ||
9 | Stacker | 1 set | ||
10 | Electrical cabinet (ABB,Omron, RKC,Schneider, Siemens etc) | |||
11 | Spare parts | 1 set | ||
PART 2 ACCESSORY MACHINE PARTS (OPTIONAL) | ||||
1 | High speed hot and cold mixer SRL-Z 300/600 | 1 set | ||
2 | Plastic crusher SWP-450 | 1 set | ||
3 | Plastic pulverizer SMP-400 | 1 set | ||
4 | Air compressor | 1 set | ||
5 | Industrial water chiller | 1 set | ||
PART 3 SHEET APPLICATIONS | ||||
1 | Roof panels, roof tiles, roof sheets, ceilings | |||
2 | Factories, warehouses, farm building, greenhouses, canopies, walkways, patio covers, Pergolas, cladding | |||
PART 4 PAYMENT, DELIVERY AND AFTER SALE SERVICES | ||||
1 | Payment terms | 40% for prepayment by T/T, 60% for balanced payment by T/T, or L/C can be acceptable | ||
2 | Delivery time | 70 days after receipt of prepayment | ||
3 | Packing method | Wooden cases/pallets with stretching films | ||
4 | Guaranteed time | 18 months for mechanical parts, 12 months for electrical parts | ||
5 | After sale service | Send 1-2 engineers to customers' factory to help them install, test the machine, and train their workers. This is chargeable | ||
6 | Contact | Ms Lilly Zhou (mob: 0086-15266238607) |
PART 5 DELIVERY, PAYMENT AND OTHERS SERVICES
1. delivery time: 90 days after receiving the deposit
2. payment terms:30% for the prepayment by T/T and 70% for the downpayment by T/T before delivery or irrevocable L/C at sight can be available, too.
3. Guaranteed time: 18 months for the machenical parts and 12 months for the electrical parts.
4. Service: we will send engineers to customers' factory to help them install, test the machine.
Best regards
Contact:Maggie
Whatsapp/Skype/Viber/Wechat: 0086 150 53256363
Email: Maggie@intermedios-cn.com