Mould Insert For Precision Plastic Injection Machine Parts And 8407 Material
Description:
Parts Name: | Mould Insert For Precision Plastic Injection Machine Parts And 8407 Material | Hardness: | 48-52HRC |
Product size: | Customized/As Per Drawings | Grinding accuracy: | ±0.001mm |
| Japan (SKD11.SKD61.SKH51.S45C) | Tolerance: | 0.001mm |
USA (AISA.D2.H13.P20.M2) | EDM Accuracy: | ±0.003mm | |
Germany (DIN.2379.2363.2344.2347) | Grind Clear Angle Max: | 0.02 | |
ASSAB(Rigor.DIVEAR.Impax.Elmax.VANADIS4.STAVAX) | EDM Angle Max: | 0.02 | |
Process: | Grinding→Wire Cutting | Grinding Finish Ra: | 0.2 |
Application: | Mould Insert For Precision Plastic Injection Machine Parts | EDM Finish Ra: | 0.3 |
Wire Cutting Finish Ra: | 0.3-0.4 | ||
Processing flow: | Heat treatment →Grinding→Wire Cutting →Quality inspection |
FAQ:
Q. How do I pay for the order?
A.The common payments are T/T(Telegraphic Transfer),Paypal.
Q. I have an idea for a new product, but don't know if it can be manufactured. Can you help?
A. Yes! We are always happy to work with potential customers to evaluate the technical feasibility of your idea or design and we can advise on materials, tooling and likely set-up costs.
Q. What type of processing technic you can offer and what type of processing technic do I need?
A.We can offer processing technic of CNC turning parts, CNC broaching, CNC milling parts, CNC drilling parts, etching machining, chemical machining, laser machining, Wire EDM, CNC shaving parts, CNC grinding parts, CNC boring parts, CNC pulling parts and so on, we will design the best solution for you base on your drawing, material and its precision demand.
Q.Ok, I've decided to go ahead with my project. How long will it take to get my parts?
A.Normally it will take abou 3 weeks to finish, but it also depens on your requst and order quantity.
Service:
1. Providing professional advises and operation.
2. Customer service online with 24 hours.
3. Full inspection on all the products before shipment.
4. Good After-sale service.
5. Strict quality control.
Our adavanges:
1. Clean and tidy workshop.
2. Strick and serious manangement, skilled and expericenced technicians.
3. Various raw material(imported and Chinese) to meet different needs of customers.
4. Equipment of high pricision.( Surface grinding,Sodick Wire-cutting.drilling machine).
5. The QC go along with all the production processes in our factory.
6. You can use English or Japanese for cummunication.
How to order?
1. We evaluate the drawing and requirement immediately.
2. We try to send the offer at the same day back to customer.
3. If we both agreed on the offer, for trade rules, we accept 50% Deposit before order, and 50% Balance when shipment is taking.Then we can start manufacturing or sample process.
4. Our production time usually takes 10 working days,sample process takes 7 days. It depends on order quanity and product itself.
5. We can ship the parts by express,air,sea according to your need.
Shipping:
We ship using express such as DHL, UPS, FEDEX etc. or according to customer's requirement . It takes about 2-5 days to arrive your front door, and proof of shippments are provided with a shipping or tracking number. And we ship by occean shippment for larger quantity items, it will be economic for customers.
Packaging:
Inner packing with recycle plastic box and anticorrosive oil, outer with sponge and PE bags, or as customer's requirements.
Sales team:
Only with teamwork can leadership be maintained.
Team spirit is a company’s core competitiveness. Only team can lead the way, only strong team can go further.
If you are interested, please do not hesitate to contact us! Thank you!