Worm Gear Precision Metal Machining Parts Cr12MoV Material Tolerance ± 0.002mm
Product Description
Boundary Dimension | outer | inner | high |
30 | 20 | 50 | |
Weight | 0.13 | ||
Raw material | Forging | ||
Main Process | CNC turning +CNC milling +package+shipment | ||
Treatment of Surface | High frequency quenching or customized | ||
Usage | industry ,CNC machine ,driving unit | ||
Protection | Plastic bag +carton +wooden cage | ||
related industry | machine industry, equipments | ||
Delivery | 1-2weeks |
Our Product Advantage
1. Our stock execute FIFO.Raw material is from famous steel factory, and quality could make sure.
2. Delivery time could be make sure.
3. High precision CNC machine to cut it. The tolerance could make sure +-0.02mm.
4. We push 6 sigma management in our factory. The process Quality is control so well.
5. IATF16949 system contral our work shop, the final product could meet your requirements
and price is competitive.
6. 100% inspect before shipment.
7. Our Products export more than 20 countries and widely praised.
Our advantage of cnc machining:
Business Type | Manufacturer |
Advantage | 1. We have more than 20 years manufacturing experience, we focus on client's demand and client's satisfaction. 2. Provide 2D & 3D drawing for modifying 3. Competitive price with good quality 4. Small order is acceptable 5. Short delivery time (7-25days according to order Qty) 6. Customized size and specification /OEM available 7. Near Qingdao port 20 miles, convenient transportation |
Application | Automobile, Motorcycle, Bicycle, Machinery, electronics, furniture,Agriculture,construction and other industrial uses. |
Widely Materials Can Be used in CNC Machining:
Materials Available
| Stainless Steel | SS201, SS303, SS304, SS316 etc. |
Steel | Q235, 20#, 45# AISI1050,AISI4140 etc. | |
Brass | C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37) , C28000(CuZn40) | |
Iron: | 1213, 12L14,1215 etc. | |
Bronze | C51000, C52100, C54400, etc. | |
Aluminum | Al6061, Al6063,AL7075,AL5052 etc | |
plastic | nylon, PE , POM etc |
Better services of CNC machining:
(Payment Terms/Trade Term/Shipment Terms/ ): | |
Our Processing | CNC machining, CNC milling and turning, drilling, grinding, bending, stamping, tapping, welding |
Surface finish | Zinc-plated, nickel-plated, chrome-plated, silver-plated, gold-plated, imitation gold-plated, |
Tolerance | 0.005mm~0.1mm |
QC System | IQC, PQC , OQC and 100% inspection before shipment for sure |
Drawing format | CAD / PDF/ DWG/ IGS/ STEP |
Packaging | Standard package / Carton or Pallet / As per customized specifications |
Payment Terms | 30 -50%T/T in advance, 70-50% balance before delivery; Pay Pal or Western Union is acceptable. |
Trade terms | EXW, FOB, CIF, As per customer's request |
Shipment Terms | 1) 0-100kg: express & air freight priority 2) >100kg: sea freight priority 3) As per customized specifications |
Note | All cnc machining parts are custom made according to customer's drawings or samples, no stock. If you have any cnc machining parts to be made, please feel free to send your kind drawings/samples to us |
FAQ
1. Where is your location?
We are located in Qingdao City of China and are closed to Airport. It takes 30minuts by car from our company
to Liuting Airport and one hour to Qingdao port.
2. How many employees do you have?
Administration / sales 4
Engineering / design as our partner 15
Production as our partners 116
Quality assurance / inspection 9
3. How long does it take to receive samples?
a) Pattern:30-45days after order
b) Sample:30days after pattern finishing.
c) The lead time is the general production period and not include the transportation time.
4. New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. to confirm the developing schedule---Prepare Prototype and sending for confirmation, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the tooling sample with initial inspection report.
5. How long is the manufacturing lead time?
Mass Production: 50days after sample approval by yours.
The lead time is the general production period not including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.
6. What basis can we buy goods?
We generally offer customers prices FOB& CIF (Carriage, Insurance & Freight). The CIF includes the freight cost to your nominated sea port.
We do provide clearance of goods which needs to be handled by a local freight forwarder.
All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping if required.