ADC12 Aluminum Die Casting Parts Metal Casting Parts For Metal Tools
Quick Detail:
· Metal Gravity Casting Parts
· Aluminum alloy
· Gravity Casting Production Technique
· Shot Blasting
· Automotive Industry
Product Description:
Metal mold gravity casting technology includes mold design, metal melting, core processing, injection molding and mold separation. First, design a metal mold according to the design drawings of the part, then melt the metal, pour the molten metal into the mold, and under the action of gravity, the metal mold forms the part. , complete the mold separation, polish the parts, and complete the whole process of metal gravity casting technology.
Product Specifications:
Commodity | Metal Gravity Casting Parts |
Standard | ASTM, DIN,JIS, EN, ISO, BS, JCSI, GB |
Material | 1) ADC10, ADC12, A360, A380, A413, A356, LM20, LM24 2) Zinc alloy 3#, 5#, 8# |
Mold Material | SKD61, H13 |
Tolerance | CT4-CT8 |
Machining | Turning, Milling, Drilling, Cutting, Reaming, Threading, Welding, Tooling, etc |
Surface Treatment | Shot blasting, Painting, Polishing, Powder coating, Electroplating, Chrome plating, etc |
Package | Standard wooden box package or as your customized package |
Applications | Agricultural machinery, Petroleum machinery, Mining machines, Construction, Automotive & Truck, Medical, Marine, Railway & Train, Power lines, Furniture, Lighting, Flange, Valve and Pump, Electronic, Pipeline, etc. |
Brand | Twinkle Industrial |
Product Applications:
Widely used agricultural machinery, petroleum machinery, mining machines, construction, automotive & truck, medical, marine, railway & train, power lines, furniture, lighting, flange, valve and pump, electronic, pipeline, etc.
FAQ
Q1. How can we get a quotation?
A: Please send the parts 2D drawing (in PDF format) and 3D model in IGS or STP format together with material, production technique, purchasing qty, etc, or provide sample to us.
Q2. What about the lead time?
A: 15-20 days for Sample making ,20 working days for mass production.
Q3. Do you have any MOQ limit for casting parts?
A: It depends on different parts. For some parts, 1 pc can be acceptable.
Q4. What is your payment term?
A: Mold: 50% payment in advance, balance after the sample approval.
B: Mass production: 30% payment in advance, 70% balance before shipment.
Q5. What is your quality control process?
A: Each casting parts will be provided with raw material report ( chemical composition and physical property), and dimension measuring report before shipment.
Q6. How about the packaging?
A: Standard wooden box package or as your customized package.