Cast Iron Tie Rod Nut Iron Casting Parts For Construction Scaffolding Accessories
Quick Detail:
· Ductile Iron Casting Nut
· Ductile iron GGG40
· Sand Wet Casting
· Shot Blasting finish
· Building or Construction
Product Description:
Formwork Tie Rod Iron Nut is a kind of important accessories in pouring shear wall project. Together with the Tie Rod, they act as wall tie system, to fasten the formwork panels tightly during concrete pouring process. They can also be used in other applications for fasten purpose. Twinkle Industrial can custom these cast iron nuts as drawing by pouring melted iron water into moulds as your detailed requirements. We make the strict quality control in raw material selection, production, pre-packaging. We have prompt and fast delivery for any order.
1. High tensile strength ductile iron after sand casting
2. High process precision, precise thread.
3. Surface treatment: electroplated by plain or yellow color
Product Specifications:
Commodity | Iron Casting & Machining Parts |
Standard | ASTM, DIN, JIS, EN, ISO, BS, JCSI, GB |
Material | Grey iron (HT200,HT250,HT300), Ductile iron (QT400-18,QT400-15,QT450-10,QT500-7) |
Unit Weight | 0,05 kg ~ 1,000 kg. |
Tolerance | CT6-CT8 |
Machining | Turning, Milling, Drilling, Cutting, Reaming, Threading, Welding, Tooling, etc |
Surface Treatment | Shot blasting, Painting, Powder coating, Electroplating, Chrome plating, etc |
Package | Standard wooden box package or as your customized package |
Applications | Agricultural machinery, Petroleum machinery, Mining machines, Construction, Automotive & Truck, Medical, Marine, Railway & Train, Power lines, Furniture, Lighting, Flange, Valve and Pump, Electronic, Pipeline, etc. |
Brand | Twinkle Industrial |
Product Applications:
Widely used agricultural machinery, petroleum machinery, mining machines, construction, automotive & truck, medical, marine, railway & train, power lines, furniture, lighting, flange, valve and pump, electronic, pipeline, etc.
FAQ
Q1. How can we get a quotation?
A: Please send the parts 2D drawing (in PDF format) and 3D model in IGS or STP format together with material, production technique, purchasing qty, etc, or provide sample to us.
Q2. What about the lead time?
A: 15-20 days for Sample making ,20 working days for mass production.
Q3. Do you have any MOQ limit for casting parts?
A: It depends on different parts. For some parts, 1 pc can be acceptable.
Q4. What is your payment term?
A: Mold: 50% payment in advance, balance after the sample approval.
B: Mass production: 30% payment in advance, 70% balance before shipment.
Q5. What is your quality control process?
A: Each casting parts will be provided with raw material report ( chemical composition and physical property), and dimension measuring report before shipment.
Q6. How about the packaging?
A: Standard wooden box package or as your customized package.