Customized SS17 4PH Military Accessory Nose Pieces Sand Blasting
Components details
process | metal injection molding |
applied software | pro-e, CAD, PDF |
material | SS17-4ph stainless steel |
surface finish | sandblasting |
tolerance precision | ±0.05mm |
quality system | ISO9001 and100% inspection before shipment |
dimensions | as per customer's requests |
samples qty | 5-10 pcs(for free) |
certification | ISO 9001, TS 16949 |
packgae | carton or as customer's requests |
lead time | 20-25days after confirmed samples |
1, MIM Technology Advantage/Features
1, MIM is an advanced metal forming technology that use injection molding machine to manufacturing precision and complex metal parts, which combines the advantage of PM and plastic injection molding.
it’s suit to do mass production with complicated shapes;
it can use all kind of metal material(such as stainless steel, iron, ceramic and titanium, etc)
its relative density can achieve more than 98%
its finished products is close to final products, reducing the post-treatment cost, and then save production cost
compared with tranditional CNC and precision casting process, the structure are more even and preformance is much better
compared with PM(Powder Metallurgy), MIM can produce more complex shape and better preformance metal products.
2, Description Of Metal Injection Molding
1. The Metal powder injection molding (MIM) is a high-tech near net shape technology to mass production
of small but precision metal parts with complex structure, high precision and performance requirements.
2. MIM technology has its advantages over than traditional powder metallurgy, CNC machining, investment
casting, and other alternative methods.
3. Derive the stable product quality, production efficiency is high, easy to implement the mass production.
3, Quality policy:
Zero defecets, doing things to be best in one time
Keeping improve and never stop pursuing perfect attitde
reducing cost, and contine improve the compition of products
2, Quality goal:
quality rate can achieve 98%
quality rate of half-finished products is 99%
the failure cost is <2%
3, Our all of products are suit ROHS standard, green parts, without any pollution.
4, Company Advantage
1, Quality policy:
Zero defecets, doing things to be best in one time
Keeping improve and never stop pursuing perfect attitde
reducing cost, and contine improve the compition of products
2, Quality goal:
quality rate can achieve 98%
quality rate of half-finished products is 99%
the failure cost is <2%
3,Our all of products are suit ROHS standard, green parts, without any pollution.
5, Service:
1, 100% checking before shipment.
2, Satisfied packing, carton, pallet,or according to your requests.
3, Samples are within 30-45 days after the receipt of the deposit and the mold manufacture need 30-35 days. production will be finished about 25-30 days after samples confirmation.