3D Gold Bottle Opener Key Ring , Round Shaped With Personalized Logo
1 Description of the 3D gold bottle opener key ring
Item Name |
3D Gold Bottle Opener Key Ring |
Material | Zinc alloy body and iron chain |
Weight | about 38g |
Front side | 3D |
Back side |
blank |
Plating |
gold |
Packing | each into a poly bag, 300pcs into a carton, carton size:33*31*18cm, G.W/N.W: 15.1/14.1kg |
Sample time | 5 days for existing sample, 8-10 days for custom design after the payment and artwork confirm. |
Production time | 20-30 days after the sample conifrm (all the opener need to produce without stock). |
2 About beer bottle opener
Beer bottle opener is tool to open the bottle for the beer, it is make by metal, such zinc alloy, aluminum, stainless steel, sometime have plastic, wood or PVC material. Most the bottle opener will make as a multi-function tool, such as keyring and magnet. The logo on opener could be 3D embossed, debossed, silk screen print, laser, soft enamel, color fill, epoxy and so on; the logo make the opener not a only a tool, but also a gift to promote the business.
3 Leading time
♦ sample time: 5 days for existing sample, 8-10 days for custom design after the payment and artwork confirm.
♦ production time: 25-35 days after the sample confirm.
4 Payment
♦ full moulding charge for confirm the sample, TT 30% as deposit, balance need to pay before shipment
♦ T/T, Paypal, Western Union, MoneyGram are available
5 Shipping information
♦ delivery term: ex-factory, door to door, FOB and CIF
♦ delivery time: door to door about 4-7 days; air shipment about 7-15 days;sea shipment about 25-40 days
♦ Express: DHL, Fedex, UPS and TNT
6 Competitive Advantage
- good plating: we have lead and nickel test report, and also healthy plating solution
- rich products line: all metal gift item we do, and also has leather, PVC, and silicone item too.
- strict QC system: integrity QC system and perfect quality control system as ISO9001:2008
- more material available: as zinc alloy, iron, copper, stainless steel, leather, PVC, silicone and so on
- on time delivery: about 25-35 days for production
- advanced equipment: advanced equipment for designing, mould-making department to logo making, we can provide one-stop in-house manufacturing of innovative.