Rack Upright Roll Forming Machine With Hydraulic Punching And Cutting
Product Description
This Rack Upright Roll Forming Machine is consisted with auto-de-coiler, guide frame, lever/feeding section, continuous hole punching section, forming section, positioning and cutting section, collection table and electrical control system etc. All kinds of roll forming machine can customized, so just send your profile drawing to me.
Technical Data
Material of coil | Items | Specifications |
Material | Galvanized steel/Black steel | |
Material Width | As per sketch | |
Size | Customized | |
Material Thickness | According customer | |
Uncoiler | 3T manual | |
Leveling & Servo Feeding | Rollers | 3roller up, 4rollers down |
Feeder power | 1.1Kw | |
Hydraulic punching device | Hydraulic power | 7.5KW |
Punching type | Hydraulic punching | |
Punching Moulds | 2sets | |
Mould material | Cr12Mov | |
Forming system | Line Speed | 4-6 m/min |
Roller Stations | 16stations | |
Roller Material | Gcr15, quenching, HRC55-58° | |
Shaft Material | 45#steel | |
Shaft DIA | 70mm | |
Main Motor Power | 22 kw | |
Structure | Wall plate | |
Way Of Drive | Chain | |
Hydraulic Cutting system | Blade material | Cr12Mov |
Tolerance | +-1.5mm | |
Hydraulic Power | 5.5KW | |
Electrical control system | PLC | Panasonic |
Electric Source | 380V, 50HZ,3 phase | |
Encoder | Omron |
Main Items
No. | Name | Qty(set) |
1 | Manual Uncoiler | 1 |
2 | Leveling & Servo Feeding | 1 |
3 | Hydraulic punching | 1 |
4 | Main Roll Forming Machine | 1 |
5 | Hydraulic Cutting | 1 |
6 | PLC control box | 1 |
7 | Output Table | 2 |
Profile drawing
Working Flow
Decoiler --- Servo Feeding --- Punching--- Levelling--- Roll Forming ---- Cutting ---- Run out table
Package&Delivery
Customer visit
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
7. Q: How to visit your factory?
We are in jiangyin city,belongs to Jiangsu province,
near Shanghai. If you arrive at Shanghai Airport,we can pick you up
It is 160 kilometers from Pudong Airport, about 3 hours.
It's 110 kilometers from Hongqiao airport, about 2 hours; It's 125 kilometers from downtown Shanghai about two and a half hours.
It is very convenient.Please let me know if you have booked the tickets
so that I can prepare and book a hotel for you,we will arrange for car to pick you up.
By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour.
8. Q: How to place order ?
Inquiry---confirm the profile drawings and technical specification and price----confirm the PI---arrange the deposit or L/C---start production-- do inspection--- Shipment
9. What are your terms of payment ?
First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.