Specifications
Brand Name :
DINGBO
Model Number :
DBRF
Certification :
CE ISO
Place of Origin :
Jiangsu,China
MOQ :
1 set
Price :
USD45,000-55,000set
Supply Ability :
20sets/month
Delivery Time :
Shipped in 30-70 days after payment
Packaging Details :
1.nude package and fixed by steel rope. 2.A full set of 40GP container.
Decoiler :
Manual decoiler
Material :
Galvanized steel/Black steel
Cutting system :
Hydraulic Cutting
Line Speed :
4-6 m/min
Roller Stations :
16stations
Way Of Drive :
Chain
Main Motor Power :
22 kw
PLC :
Panasonic
Description

Rack Upright Roll Forming Machine With Hydraulic Punching And Cutting
Product Description
This Rack Upright Roll Forming Machine is consisted with auto-de-coiler, guide frame, lever/feeding section, continuous hole punching section, forming section, positioning and cutting section, collection table and electrical control system etc. All kinds of roll forming machine can customized, so just send your profile drawing to me.
Technical Data

Material of coilItemsSpecifications
MaterialGalvanized steel/Black steel
Material WidthAs per sketch
SizeCustomized
Material ThicknessAccording customer
Uncoiler3T manual
Leveling & Servo FeedingRollers3roller up, 4rollers down
Feeder power1.1Kw
Hydraulic punching deviceHydraulic power7.5KW
Punching typeHydraulic punching
Punching Moulds2sets
Mould materialCr12Mov
Forming systemLine Speed4-6 m/min
Roller Stations16stations
Roller MaterialGcr15, quenching, HRC55-58°
Shaft Material45#steel
Shaft DIA70mm
Main Motor Power22 kw
StructureWall plate
Way Of DriveChain
Hydraulic Cutting systemBlade materialCr12Mov
Tolerance+-1.5mm
Hydraulic Power5.5KW
Electrical control systemPLCPanasonic
Electric Source380V, 50HZ,3 phase
EncoderOmron

Main Items

No.NameQty(set)
1Manual Uncoiler1
2Leveling & Servo Feeding1
3Hydraulic punching1
4Main Roll Forming Machine1
5Hydraulic Cutting1
6PLC control box1
7Output Table2


Profile drawing
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
Working Flow
Decoiler --- Servo Feeding --- Punching--- Levelling--- Roll Forming ---- Cutting ---- Run out table
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel

Package&Delivery
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
Customer visit
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.

2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.

6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
7. Q: How to visit your factory?
We are in jiangyin city,belongs to Jiangsu province,
near Shanghai. If you arrive at Shanghai Airport,we can pick you up
It is 160 kilometers from Pudong Airport, about 3 hours.
It's 110 kilometers from Hongqiao airport, about 2 hours; It's 125 kilometers from downtown Shanghai about two and a half hours.
It is very convenient.Please let me know if you have booked the tickets
so that I can prepare and book a hotel for you,we will arrange for car to pick you up.
By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour.
8. Q: How to place order ?
Inquiry---confirm the profile drawings and technical specification and price----confirm the PI---arrange the deposit or L/C---start production-- do inspection--- Shipment
9. What are your terms of payment ?
First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.









































Send your message to this supplier
Send Now

22kw 6m/Min Upright Rack Roll Forming Machine For Galvanized Steel

Ask Latest Price
Watch Video
Brand Name :
DINGBO
Model Number :
DBRF
Certification :
CE ISO
Place of Origin :
Jiangsu,China
MOQ :
1 set
Price :
USD45,000-55,000set
Contact Supplier
video
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel
22kw 6m/Min Upright  Rack Roll Forming Machine For Galvanized Steel

Jiangyin Dingbo Technology CO., Ltd.

Active Member
14 Years
jiangsu
Since 2008
Business Type :
Manufacturer, Exporter
Total Annual :
3 Million-5 million
Employee Number :
45~60
Certification Level :
Active Member
Contact Supplier
Submit Requirement