Hydraulic Cutting 380V Metal Roofing Double Layer Forming Machine With PLC
1. Brief introduction of Double Layer Forming Machine
Double Layer Forming Machine offers a profitable solution for space and energy, combines Roofing, Wall Cladding, Corrugated profiles in one machine.Base on stable and durable performance, we knows well on various Roofing profile in different markets. Maximize cover width, Logo embossing, Anti-capillary grooves, we also offer customized product for client to supply their innovative idea to market.
this serious including Roofing, Wall Cladding, Corrugated profiles for both Coated Coil (PPGI/PPGL) and Galvanized Coil (GI/GL).
2. Specifications of Double Layer Forming Machine
1 | Suitable to process | Color steel plate |
2 | Width of the plate | 914mm/1000mm/1200mm/1220mm/1250mm |
3 | Thickness of the plate | 0.3-0.8mm |
4 | De-coiler | Manual one, can load 5 tons raw material |
5 | Rollers for forming | 16 rows |
6 | Diameter of the roller | 80mm |
7 | Rolling material | Carbon Steel 45# |
8 | Main motor power | 5.5kw |
9 | Material of the cutting blade | Cr12 mov |
10 | Hydraulic cutting power | 4kw |
11 | Processing precision | Within 1.00mm |
12 | Control system | Delta PLC control |
13 | Side panel of machine | 16mm |
14 | Main structure of the machine | 350 H steel |
15 | Weight | About 3T |
16 | Dimensions | 5.6*1.2*1.5m |
17 | Voltage | 380V 50Hz 3phases(changeable as needs) |
18 | Certificate | CE/ISO |
19 | Custom | According to customer's requirements |
3. Customer Feedback of Double Layer Forming Machine
1) Engineer will give free training lessons to labors in buyer's factory.
2) The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD150 per day for engineer.
3) During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
4). We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
4. details photos of Double Layer Forming Machine