Our stamping operations feature presses in the 45-ton to 1,100-ton range, which gives us the versatility to generate parts using
thin gauge .004” foils as well as plate measuring up to 0.5” in thickness. We have capabilities in all stamping methods, including
progressive die, continuous strip, compound die, deep drawing, etc. By leveraging our integrated knowledge of material properties
and stamping technology, we develop the tooling and implement controllable manufacturing processes to repeatably produce
dimensionally accurate parts. Materials we frequently work with include carbon steel, aluminum, copper, brass, and an extensive
selection of other metals and alloys.
Name | Size | QTY |
Metal stamping presses | 60 tons to 1100 tons | 130 |
CNC sheet metal bender | 100 tons | 7 |
Laser cutting machine | 4m*2m-2000w | 3 |
CNC flame cutting machine | 6×4 | 2 |
CNC plasma cutting machine | 6×4 | 2 |
ARC welding machine | 20 | |
MIG welding machine | 15 | |
Powder coating line | 1 |
FUTONG Team
Production Development- FUTONG New Product Development(NPD)Team for Creation and launch of Products to Meet Customer Needs,the Process includes Stages such as ideation,Marketing Strategy and Commercialization.
Intelligent Production System(IPS)-FUTONG Manufacturing System that uses Technology to integrate people,Machines,and Processes to Improve Production Results and Reduce Waste.
Quality Assurance-FUTONG ISO9001 Certification in 2009,Our Quality Department Include IQC,PQC and OQC,these Ensure that we can Provide Customers with Satisfactory Products.
Logistics Team-FUTONG Logistics Guys Resposible for the Planning,Execution and Control of the Flow of goods from Our Company to their Destination.
FUTONG History and Development
2007 As Specialized customized Metal Fabrication Manufactory Establish.
2009 ISO9001 Certification
2011 Laser Cutting Machine;CNC Bending Center,
2015 Establish Foreign Trade Team,Main Business for Metal Timber Connector Business.
2016 New Workshop and New Office Building,Workshop Area Expanded to 15000 Square Meters.
2018 Regist Trademark FUTONG and SUREALONG,Expanding Brand into Oversea Markets.
2020 Set up a Special Department of Timber Building Hardware,Provide all Hardware of Timber Building.
2024 Preparing to Set Up Overseas in North America,Europe and Australia.
Order Process
1: Get your drawings and requirements about Products.
2: Confirm products details.
3: Quotation, freight and delivery.Note:
a. Sample unit cost will be 3 times based on the final quotation.
b. Because samples are customized, it takes us more labor costs than mass production.
c. Usually sample delivery time is around 10 to 20 days.(up to the products)
4: Provide PI to you, you make payment accordingly.
5: Start production, and keep in touch with you .Step 6: Send you details and photos when qualified sample is finished.Step
7: Shipment after above information is confirmed.
Trust
Surealong Group Corporation is committed to obtain and retain the trust of our customer, personnel and all our other interest groups.
Customer Satisfaction
We will keep(meet or exceeds) our customers satisfied and confident of our performance.
Continues Improvement
We continuously and systematically improve our processes on the basis of customer feedback and benchmarking.
Strive for Excellence
We are committed to strive for excellence and to meet consistent aggressive goals in everything we do.