Specifications
Brand Name :
VIC-TECH
Model Number :
VSM20A-48S
Certification :
RoHS, ISO9001
Place of Origin :
China
MOQ :
1Unit
Price :
$11~$32/Unit
Payment Terms :
Western Union, T/T, L/C, MoneyGram
Supply Ability :
100000 Units/year
Delivery Time :
15-30 work days
Packaging Details :
Standard export package in corrugated carton (Mass production).
Motor type :
Linear stepper motor
Motor diameter :
20 mm
Step angle :
7.5°/step
Phase current :
160 mA/phase
Phase number :
2 phases (Bipolar)
Coil resistance :
74.5Ω/phase
Description

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

VSM20A-48S is 20mm diameter linear stepper motor with 135mm length extra long trapezoidal lead screw. The length of lead screw is adjustable.

Besides lead screw, motor’s resistance, step angle can all be customized.

Customers can adjust all the parameters based on their own requirement.

Screw lead determines motor’s linear speed and thrust, with longer lead, motor has higher linear speed, with smaller linear pushing force/thrust.

We have two different types of step angle, including 7.5° and 15°/step.

With higher rated voltage, motor has higher coil resistance, and it depends on customer’s power supplier and driver parameters.

Typical applications:

* Medical Equipment

* Linear Robotic Control

* Precision Calibration

* High Precision Valve

* Other Precise Position Movement

Plus tt has extra low noise and high stability.

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

Design Layout (Unit:mm)

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

Parameter sheet:

Motor type Linear stepper motor
Motor diameter 20mm
Rated power 3.4W
Rated voltage 12V DC
Phase current 160mA/pahse
Phase resistance 74.5Ω/phase
Phase inductance 36 mH/phase
Step angle 7.5°/step
Screw lead 0.6096mm (customizable)
Step length 0.0127mm/step
Leads crew length 135 mm (customizable)
Phase No. 2 phases
Driving method 2-2 excitation

Chart of Thrust vs speed(PPS):

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

Competitive Advantage

  • High quality and the best price.

  • Fast deliver,storage company and rich inventory

  • Near Shanghai port, the traffic is very convenient.

Product Detail Presentation

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

Send your message to this supplier
Send Now

VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

Ask Latest Price
Watch Video
Brand Name :
VIC-TECH
Model Number :
VSM20A-48S
Certification :
RoHS, ISO9001
Place of Origin :
China
MOQ :
1Unit
Price :
$11~$32/Unit
Contact Supplier
video
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor
VSM20A-48S 20mm diameter external drive long lead screw permanent magnet linear stepper motor

Changzhou Vic-Tech Motor Technology Co., Ltd.

Verified Supplier
7 Years
jiangsu, changzhou
Since 2011
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter, Trading Company
Total Annual :
5000000-6000000
Employee Number :
20~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement