Metallic Ore Dressing Agent / Gold Leaching Agent Of Ore Dressing Equipment
1. Gold Leaching Agent Of Ore Dressing Equipment Application scope;
(1) Applicable scope: gold, silver oxide ore, primary ore, cyanidation tail slag, sulfide ore, roasted gold concentrate, sulfuric acid slag, lead and zinc slag, anode mud, circuit board and other kinds of gold-containing materials;
(2) Applicable process: heap leaching, pool leaching, carbon pulp (stirring leaching) process.
2.Gold Leaching Agent Of Ore Dressing Equipment parameter
Product form | solid gray white block |
Dissolution method | It can be used after fully stirring and dissolving with water at room temperature |
Adjust basicity | lime or caustic soda is generally used to adjust and maintain PH value of 10-12 |
3.Gold Leaching Agent Of Ore Dressing Equipment Calculation of drug dispensing:
(1) Dosage can refer to the amount of sodium cyanide, it is recommended to conduct beneficiation test to determine the best use conditions. (According to experience: for 1-2g/t gold oxidized ore, the concentration of liquid is generally kept at 0.3-1‰, which can be adjusted appropriately according to different ore grade and impurity content)
(2) Method of use:
Heap leaching process: 0.03-0.1% solution prepared with clean water for spraying;
Stirring leaching process: it can be configured to add 10%-15% solution, or directly added to the stirring tank in the form of solid, the concentration of reagent in the leaching pulp is generally in the range of 0.03-0.1%.
(3) Calculation method of dosage:
Dosage of tonic = (optimal concentration value - current concentration value) × dosage of water;
It is assumed that the optimal concentration value is 0.8‰ (measured by water volume), the backwater concentration is 0.3‰, and the lean liquid pool is 1000 cubic meters of water. Dosage of tonic :(0.8-0.3) ×1000=800 kg
Metallic Ore Dressing Agent / Gold Leaching Agent Of Ore Dressing Equipment
Metallic Ore Dressing Agent / Gold Leaching Agent Of Ore Dressing Equipment
Metallic Ore Dressing Agent / Gold Leaching Agent Of Ore Dressing Equipment
FQA
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time :
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms :
A: Accept payment type: T/T, L/C, Western union,Cash. 30% deposit when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: Guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply.
Q: After sales service?
A: We can supply technical guide for machines running test and parts maintenance if end user needs.