The gravity spiral chute is made of light chlorine plastic and it is of anti-rust and water proof. The spiral chute is used for adjusting feeding size of the granularity.
With simple structure and large capacity, the gravity concentrator is of good performance. Chute is one part of the bevel process sorting, the pulp is in certain tilt slant and it will be pushed by stratified flow in order to be layered. The light mineral discharged is called fine concentrate and the heavy minerals which are discharged from the bottom of the slot bottom is yielding tailings.
Efficient spiral chute separator
Model | 5LL-1200 | 5LL-900 | 5LL-600 | 5LL-400 | |
Outer diameter (mm) | 1200 | 900 | 600 | 400 | |
Pitch (mm) | 900 ,720 , 540 | 675 , 540 , 405 | 450 , 360 , 270 | 240 , 180 | |
Pitch to diameter ratio (pitch/diameter) | 0,75 , 0.6 , 0.45 | 0.75 , 0.6 , 0.45 | 0.75 , 0.6 , 0.45 | 0.6 , 0.45 | |
Transverse Angle (degree) | 9° | 9° | 9° | 9° | |
Each most Number of mounting screws | 4 | 4 | 3 | 2 | |
Feeding size (mm) | 0.3-.0.03 | 0.3-.0.03 | 0.2-0.02 | 0.2-0.02 | |
Ore feeding concentration (%) | 25-55 | 25-55 | 25-55 | 25-55 | |
Production capacity (ton/hour) | 4-6 | 2-3 | 0.8-1.2 | 0.15-0.2 | |
Dimensions | L(mm) | 1360 | 1060 | 700 | 460 |
W(mm) | 1360 | 1060 | 700 | 460 | |
H(mm) | 5230 | 4000 | 2600 | 1500 | |
Weight(kg) | 600 | 400 | 150 | 50 |
When using the chute when the vertical line need to be calibrated, the ore is sent to the feed mouth. adding additional water. After adjusting the concentration of mineral by adding additional water. The paddle streams down from the high place. In bevel velocity will produce a centrifugal force. Under the action of gravity and centrifugal force, ore and sand will be separated from each other. The tailings then flow into the tailings and the sand is drain away by pump to complete the whole process of the beneficiation.
FQA
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time :
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms :
A: Accept payment type: T/T, L/C, Western union,Cash. 30% deposit when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: Guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply.
Q: After sales service?
A: we can supply technical guide for machines running test and parts maintenance if end user needs.