Coal Washing Machine Jig Machine Ore Dressing Equipment Wash Box
1.Ore Dressing Equipment jig product description
Jig ging pause ore belongs to readjust the sorting operation, it with water as a separation medium, using the selected in the proportion of gangue minerals difference, carries on the sorting, jig belongs to the diaphragm, stroke and speed according to the proportion of the selected mineral, can be adjusted flexibly, widely used in tungsten, tin, alluvial gold, hematite, brown iron, manganese, titanium, antimony, lead, tantalum, niobium metals such as gravity separation.
2. Main technical data of Ore Dressing Equipment double bucket diaphragm jig :
Product specifications and technical parameters:
Model SPEC | Jig chamber |
Screen room area (m²) | Feeding size(mm) | Production capacity(t/h) | Length of stroke(mm) | Times of stroke (times/min) | Adding wate(t/h) | (kg/cm²) | Motor | Weight (kg) | |
Type | Power (KW) | ||||||||||
100×150 Diaphragm jig | 1 | 0.015 | -3 | 0.018-0.6 | - | 420 | - | 1-1.5 | Y80L-4 | 0.55 | 130 |
300×450 Double chamber diaphragm jig | 2 | 0.27 | -12 | 3-6 | 0-26 | 322 | 2-4 | 1-1.5 | Y90S-4 | 1.1 | 745 |
1000×1000 Downmoving conical jig | 2 | 2 | 1-5 | 10-25 | 0-26 | 200-350 | 60-80 | 0.6-2 | Y100L-6 | 1.5 | 1700 |
370×360 Downmoving conical diaphragm jig | 2 | 0.274 | 6 | 1-3 | 5-25 | 200-250 | 2-5 | - | Y90S-4 | 1.1 | 240 |
Working leather trapezoidal side moving diaphragm jig | 3 | 2.7 | -3 | 12.5-37.5 | 13-21 | 170-230 | 60-90 | 2 | Y90S-4 | 1.1 | 2000 |
670×920jig | 2 | 1.44 | 4-8 | 7-10 | 18-24 | 240-300 |
Mining Coal Washing Machine Jig Machine Ore Dressing Equipment Wash Box
Mining Coal Washing Machine Jig Machine Ore Dressing Equipment Wash Box
FQA
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery, construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management certificate and CE, ROHS certificates.
Q:Delivery time :
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms :
A: Accept payment type: T/T, L/C, Western union,Cash. 30% deposit when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: Guarantee time: one year for main machinery. If something wrong we will provide the technical advice and find solution immediately. For those wearing parts we guarantee high quality parts for long-term supply.
Q: After sales service?
A: We can supply technical guide for machines running test and parts maintenance if end user needs.