Description:
Equipment list of 8000BPH soft carbonated drink filling line:
First part is the RO water treatment system, please check the following parts.
2,4000LPH carbonated drink preparation line: | ||||||||
2.1 | Syrup melting pot | 500KG/h | ∮800*1600 | 1set | ||||
2.2 | Syrup Filter | 500Kg | ∮320*800 | 1set | ||||
2.3 | Mixing tank | 2000L | ∮1300*2200 | 3set | ||||
2.4 | Water chiller | 0240WST2 | 2585*900*1335 | 1set | ||||
2.4.1 | Cooling tower | HT-60 | ∮2580*2350 | 1set | ||||
2.4.2 | Cooling water pump | 100-100A | 10m lift | 1set | ||||
2.4.3 | Chilling water recycle pump | 100-100A | 10m lift | 1set | ||||
2.5 | CO2 filter | 6m3/h | ∮500*1400 | 1set | ||||
2.6 | CO2 mixing carbonator | QHS-4000-2 | 2150*1400*2400 | 1set | ||||
2.7 | Heat resistant pump/ beverage pump | / | / | 3sets | ||||
2.8 | Connection piping system | / | / | 1suit | ||||
3,8000BPH-500ml carbonated energy drink filling-packing plant: | ||||||||
3.1 | Balanced pressure 3 in 1 unit DCGF32-32-10 | 8000BPH | 3800*3200*2450 | 1set | ||||
3.1.1 | Air conveyor | FS-1 | 2.2m | 1set | ||||
3.1.2 | Belt conveyor | SYS-1 | 4m | 1set | ||||
3.1.3 | Light checker | DJ-1 | 800 | 1pc | ||||
3.1.4 | Cap lifter | TSJ-1 | 800*800*2800 | 1set | ||||
3.2 | Bottle warming machine | 8000-10000BPH | 8000*2000* 1850 | 1set | ||||
3.3 | Bottle dryer | CG-2 | 1500*500*1600 | 1set | ||||
3.4 | Online ink jet code printer | VJ1210 | 345*285*541 | 1set | ||||
3.5 | OPP hot melt glue labeling machine | OPP-300 | 3200*1524*2000 | 1set | ||||
3.6 | Automatic PE film shrink packing machine | 12packs/min | 5050*3300*2100 | 1set |